Search Oxgang planning applications
20 applications received or decided in the last 12 months · within 1 km of the centre of Oxgang · updated daily · East Dunbartonshire Council
Only 9 applications in the last 90 days, so this shows the last 12 months.
- 26 Faulds Drive Kirkintilloch East Dunbartonshire G66 3QTAwaiting decisionFirst floor front and side extensionReceived 3 Nov 2026TP/ED/26/0612
- Merkland School Langmuir Road Kirkintilloch East Dunbartonshire G66 2QFAwaiting decisionApplication under Section 42 of the Town and Country Planning (Scotland) Act 1997 to remove Condition 15 of consent TP/ED/25/0242 which requires the delivery of an accessible path from the application site to the Merkland Recreation Area to the southReceived 29 Oct 2026TP/ED/26/0528
- 61 Monkland Avenue Kirkintilloch East Dunbartonshire G66 3BTAwaiting decisionAlterations to existing rear sun room and raised deckingReceived 8 Sep 2026TP/ED/26/0504
- Land Adjacent To Woodilee Road Lenzie East DunbartonshireAwaiting decisionApproval of matters specified in conditions 02, 03, and 04 (A, B, C, D, E, G, H(ii) I, J, K(i), K(ii), K(iii), K(iv), K(vii), K(viii), and L) of Planning Permission in Principle TP/ED/22/0777 for the erection of care home (Class 8) and associated development, including access, parking, drainage and landscapingReceived 31 Aug 2026TP/ED/26/0388
- 81 Woodcroft Drive Lenzie East Dunbartonshire G66 3WDAwaiting decisionSingle storey rear extension and raised patioReceived 24 Aug 2026TP/ED/26/0464
Planning in Oxgang
- Approved
- 97%
- 37 of 38 decided
- Decision time
- about 13 weeks
- on average
Applications within 1 km of the centre of Oxgang in the last 24 months, from East Dunbartonshire Council's planning register.
Decided by East Dunbartonshire CouncilCouncil page
Around Oxgang
Postcode districts
G66 147 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: East Dunbartonshire Council
For home projects and trades
- Architects in OxgangFor planning applications, extensions and new builds.
- Building contractors in OxgangLocal builders for approved plans and permitted development.
Builders and trades: get new Oxgang jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Oxgang
Oxgang, located in East Dunbartonshire, is a historical term referring to an old land measurement traditionally used in Scotland and England since the 16th century. Typically averaging around 20 English acres, the size of an oxgang could vary based on land fertility and cultivation practices, sometimes measuring as little as 15 acres. This historical context can be relevant for those researching planning applications in the area, particularly in understanding land use and development potential.
There are currently no active flood warnings for the Oxgang area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (February 2026). This makes Oxgang a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Oxgang planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Oxgang, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 45 planning applications were submitted near Oxgang. Of these, 97% were approved, with an average decision time of 88 days.
The most common types were full planning applications (25), outline applications (5), advertising consent (1).