Search North Camp planning applications
18 applications received or decided in the last 90 days · within 1 km of the centre of North Camp · updated daily · Rushmoor Borough Council
- 100 Osborne Road Farnborough Hampshire GU14 6ASApprovedNon Material Amendment to planning application : 26/00239/FULPP (demolition of detached garage and erection of a single storey side/rear extension) to allow changes to fenestrations and infill of rear porchReceived 22 Oct 2026Decided 30 Oct 202626/00562/NMAPP
- 1 Church Path Farnborough Hampshire GU14 6DLAwaiting decisionErection of a part two storey and part single storey rear extensionReceived 16 Oct 202626/00549/FULPP
- 73 - 75 Lynchford Road Farnborough Hampshire GU14 6EJApprovedDemolition of existing rear storage structures and the construction of a detached X-storey building comprising 2 X two-bedroom flatsReceived 15 Oct 2026Decided 29 Jul 202626/00554/FUL
- 7 Alexandra Road Farnborough HampshireApprovedT1 Horse Chestnut in car park as per submitted plan and photos, crown lift over parking areas and gardens to no more than 3 metres from ground level and remove major deadwood. The tree is within South Farnborough Conservation AreaReceived 24 Sep 2026Decided 29 Oct 202626/00507/CATPP
- Aldershot Military Historical Trust And Museum Evelyn Woods Road Aldershot Hampshire GU11 2LGAwaiting decisionListed Building Consent : Replacement of external double doors to The John Reed GalleryReceived 23 Sep 202626/00508/LBCPP
Planning in North Camp
- Approved
- 82%
- 46 of 52 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of North Camp in the last 24 months, from Rushmoor Borough Council's planning register.
Decided by Rushmoor Borough CouncilCouncil page
Around North Camp
Postcode districts
GU14 325 applications in the last 12 monthsGU11 129 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Rushmoor Borough Council
For home projects and trades
- Architects in North CampFor planning applications, extensions and new builds.
- Building contractors in North CampLocal builders for approved plans and permitted development.
Builders and trades: get new North Camp jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About North Camp
North Camp is a vibrant suburb of Farnborough, Hampshire, located adjacent to Aldershot Military Town, forming part of the Farnborough/Aldershot Built-up Area. This proximity to military facilities and urban amenities makes it a significant area for planning applications, particularly those related to residential and commercial development.
There are currently no active flood warnings for the North Camp area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes North Camp a particularly low-crime area, which is often reflected in its desirability and property values.
The area around North Camp has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, North Camp planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near North Camp, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 66 planning applications were submitted near North Camp. Of these, 82% were approved, with an average decision time of 53 days.
The most common types were tree works (17), full planning applications (15), outline applications (4).