Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

New Winton, East Lothian Planning Applications

Recent planning applications near New Winton, East Lothian.

East Lothian · Scotland · settlement

View council

Enter a postcode to search for planning applications near New Winton.

Town Insights

Property Prices

Area Information

  • Admin district: East Lothian
  • Parliamentary constituency: Lothian East
  • LSOA: Macmerry Longniddry - 03

Crime Statistics

0 crimes reported in 2026-02.

Flood Risk

No active flood warnings near New Winton.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near New Winton.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for New Winton based on the last 24 months of planning data.

Nearby Applications

4 planning applications found near New Winton.

  1. - 8 Winton Terrace New Winton Tranent EH33 2NQ
    Alterations, extension to house, formation of first floor terrace with hand rail, erection of external staircase, fencing and decking
    Type: Full | Council: East Lothian | Date: 2025-10-17
    View full details
  2. - 5 Winton Court New Winton Tranent EH33 2NL
    Alterations and extension to house
    Status: Permitted | Type: Full | Council: East Lothian | Date: 2025-10-08
    View full details
  3. - 11 New Winton Cottages New Winton Tranent EH33 2NH
    Alterations to house
    Status: Permitted | Type: Full | Council: East Lothian | Date: 2025-04-28
    View full details
  4. - Community Hall New Winton Tranent EH33 2NH
    Installation of solar panels and replacement windows
    Status: Permitted | Type: Full | Council: East Lothian | Date: 2025-03-20
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of New Winton in East Lothian

New Winton is a settlement located in East Lothian, Scotland.

There were no crimes reported in the immediate area during the most recent reporting period. This makes New Winton a particularly low-crime area.

For anyone interested in property development or monitoring local planning decisions, New Winton planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in New Winton

In the last 24 months, 5 planning applications were submitted near New Winton. Of these, 100% were approved, with an average decision time of 80 days.

This is notably above the national average of approximately 87%, suggesting a relatively permissive planning environment. Applicants near New Winton may find that well-prepared applications have a strong chance of success.

The average decision period of 80 days exceeds the 8-week target for minor applications but falls within the 13-week target for major schemes. Applicants should plan for approximately 12 weeks from submission to decision.

The most common application types near New Winton were full planning applications (5). Full planning applications account for 100% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.

Nearby Towns

Explore planning applications in nearby areas:

  • Macmerry planning applications
  • Ormiston planning applications
  • Seton planning applications
  • Penston planning applications
  • New Town planning applications
  • Tranent planning applications
  • Seton Mains planning applications
  • Meadowmill planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account