Search New Eltham planning applications
45 applications received or decided in the last 90 days · within 1 km of the centre of New Eltham · updated daily · Royal Borough of Greenwich
- London Borough Of Bromley, Sidcup Family Golf, Sidcup By Pass Road, Chislehurst, BR7 6RPAwaiting decisionNeighbouring borough consultation for the Part demolition of existing driving range and adventure golf buildings and erection of part single-, part two-storey extension, 4 x covered padel courts and 3 x external pickleball courts, with extensive landscaping and ancillary works.All OtherReceived 5 Nov 202626/02063/ALA
- 87, Pinewood Avenue, DA15 8BBAwaiting decisionErection of a first floor rear extension.All OtherReceived 4 Nov 202626/02046/FUL
- 57 Montbelle Road, Eltham, London, SE9 3PDAwaiting decisionCertificate of Lawfulness (Proposed) is sought for loft conversion with a hip to gable roof, rear dormer window, 3 rooflights to front roof slope and a window to side elevation at loft level.All OtherReceived 2 Nov 202626/2914/CP
- 25, Little Birches, DA15 7LNAwaiting decisionErection of a single storey rear and side extension following demolition of existing garage.All OtherReceived 28 Oct 202626/01968/FUL
- 25-47 Heron Crescent, Sidcup, Kent, DA14 6RTAwaiting decisionReplacement of existing windows with uPVC double-glazed windows and balcony doors to be replaced with uPVC to match existing.All OtherReceived 28 Oct 202626/02003/FUL
Planning in New Eltham
- Approved
- 81%
- 277 of 335 decided
- Decision time
- about 9 weeks
- on average
Applications within 1 km of the centre of New Eltham in the last 24 months, from Royal Borough of Greenwich's planning register.
Decided by Royal Borough of GreenwichCouncil page
Around New Eltham
Postcode districts
SE9 575 applications in the last 12 monthsDA15 295 applications in the last 12 monthsDA14 248 applications in the last 12 monthsBR7 316 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Royal Borough of Greenwich
For home projects and trades
- Architects in New ElthamFor planning applications, extensions and new builds.
- Building contractors in New ElthamLocal builders for approved plans and permitted development.
Builders and trades: get new New Eltham jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About New Eltham
New Eltham is a suburban area situated in South East London, predominantly within the Royal Borough of Greenwich, with some sections extending into the London Borough of Bexley. It lies southeast of Eltham and northwest of Sidcup, making it a key location for potential planning applications in the region.
There are currently no active flood warnings for the New Eltham area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes New Eltham a particularly low-crime area, which is often reflected in its desirability and property values.
The area around New Eltham has 4 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, New Eltham planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near New Eltham, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 380 planning applications were submitted near New Eltham. Of these, 81% were approved, with an average decision time of 65 days.
The most common types were full planning applications (39), outline applications (35), discharge of conditions (12). 1 large-scale development was submitted during this period.
13 planning appeals were lodged, of which 5 were allowed and 7 were dismissed (42% success rate).