Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

Moor Park, Herefordshire Planning Applications

Recent planning applications near Moor Park, Herefordshire.

Herefordshire · England · settlement

Planning applications in Moor Park are administered by Herefordshire Council. View the full Herefordshire Council planning applications page for approval rates and decision timelines.

Enter a postcode to search for planning applications near Moor Park.

Town Insights

Property Prices

Average property sale price: £320,706 (based on 50 recent transactions from HM Land Registry).

Area Information

  • Admin district: Herefordshire, County of
  • Parliamentary constituency: North Herefordshire
  • LSOA: Herefordshire 007A

Crime Statistics

0 crimes reported in 2026-05.

Flood Risk

No active flood warnings near Moor Park.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near Moor Park.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for Moor Park based on the last 24 months of planning data.

Nearby Applications

9 planning applications found near Moor Park.

  1. P261320/FH - 91 Westfaling Street Hereford Herefordshire HR4 0JE
    Demolition of existing rear lean-to and construction of new rear single storey extension.
    Status: Undecided | Type: Full Householder | Council: Herefordshire | Date: 2026-05-04
  2. P261117/J - 9 Baggallay Street Hereford Herefordshire HR4 0DZ
    Tree works
    Status: Undecided | Type: Works to trees covered by TPO | Council: Herefordshire | Date: 2026-04-07
  3. P260092/PDV - land outside 110/112 Westfaling Street Hereford HR4 0JF
    Regulation 5 - BT Notice of Intention to install fixed line broadband apparatus
    Status: Undecided | Type: Permitted Development | Council: Herefordshire | Date: 2026-01-09
  4. P253347/J - 18 Meyrick Street Hereford Herefordshire HR4 0DY
    T1: Pine - reduce the upper west side of the crown by approx 2m (growing towards house number 25 Meyrick street). Remove any deadwood over 40mm and prune out the split limb that is hanging over
    Status: Approved | Type: Works to trees covered by TPO | Council: Herefordshire | Date: 2025-11-19
  5. - 10 Gruneisen Street Hereford Herefordshire HR4 0DX
    Beech tree - crown lift. Remove lower overhanging branches.
    Status: Unresolved | Type: Trees | Council: Herefordshire | Date: 2025-09-16
    View full details
  6. - 234 Whitecross Road Hereford Herefordshire HR4 0DL
    Replacement refrigeration plant
    Status: Conditions | Type: Full | Council: Herefordshire | Date: 2025-04-02
    View full details
  7. - 10 Meyrick Street Hereford Herefordshire HR4 0DY
    Tree TPO 152, Variegated Maple - suffering from extensive squirrel damage from bark peeling - to be pollarded. Remove lower limband two lateral branches and small regrowth branches. 10% crown reductio
    Status: Permitted | Type: Trees | Council: Herefordshire | Date: 2025-03-17
    View full details
  8. - 14 Ingestre Street Hereford Herefordshire HR4 0DU
    T1. Robinia pseudoacacia (False Acacia). This tree is in quite severe decline but does have some healthy epicormic growth on the trunk and some live buds sporadically distributed around the canopy. Re
    Status: Permitted | Type: Trees | Council: Herefordshire | Date: 2025-01-20
    View full details
  9. - 31 Three Elms Road Hereford Herefordshire HR4 0RH
    T1: English Oak - reduce the overall crown by approx 6m, prune out any major deadwood over 100mm, remove the dead ivy from stem. T2: Common Beech - prune the deadwood from the lower branches that are
    Status: Permitted | Type: Trees | Council: Herefordshire | Date: 2023-12-29
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of Moor Park in Herefordshire

Moor Park is a settlement located in Herefordshire, England.

Property prices in Moor Park show an average sale price of £320,706, based on 50 recent transactions recorded by HM Land Registry.

There were no crimes reported in the immediate area during the most recent reporting period. This makes Moor Park a particularly low-crime area.

Moor Park has 4 conservation areas within its boundaries: Huntington, Hereford Central Area, Broomy Hill, Widemarsh Common. Planning applications within or near these conservation areas are subject to additional scrutiny to preserve the architectural and historic character of the area. Homeowners and developers should be aware that permitted development rights may be restricted.

Ecology & Nature Designations

The area around Moor Park includes 1 Sites of Special Scientific Interest (SSSI): River Wye SSSI; 1 Ancient Woodland site; 1 Special Areas of Conservation (SAC): River Wye. These designations may affect planning decisions, as proposals near protected sites require environmental impact assessment and may face additional restrictions.

For anyone interested in property development or monitoring local planning decisions, Moor Park planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in Moor Park

In the last 24 months, 73 planning applications were submitted near Moor Park. Of these, 83% were approved, with an average decision time of 58 days.

This is broadly in line with the national average of approximately 87%. Moor Park maintains a standard approach to planning decisions.

At 58 days on average, decisions near Moor Park slightly exceed the 8-week statutory target for minor applications, though this is common across many councils.

The most common application types near Moor Park were full planning applications (11), tree works (11), discharge of conditions (2). Full planning applications account for 15% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.

In terms of development scale, 4 medium-scale applications, 25 smaller schemes were submitted. The absence of major applications suggests the area is primarily characterised by smaller-scale improvements and extensions rather than large new developments.

Nearby Towns

Explore planning applications in nearby areas:

  • White Cross planning applications
  • Broomy Hill planning applications
  • Warham planning applications
  • Blackmarstone planning applications
  • Widemarsh planning applications
  • Huntington planning applications
  • Hereford planning applications
  • Hunderton planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account