Search Metcombe planning applications
11 applications received or decided in the last 12 months · within 1 km of the centre of Metcombe · updated daily · East Devon District Council
Only 5 applications in the last 90 days, so this shows the last 12 months.
- The Leys Higher Broad Oak Road West Hill Devon EX11 1XJAwaiting decisionBeech : crown lift of drooping growth up to 4m, maximum diameter of cuts (MDC) 60mm. Selective reduction of the lateral crown around the circumference of the tree by up to 2m, MDC 120mm.Received 2 Nov 202626/2131/TRE
- South Riding Lower Broad Oak Road West Hill Devon EX11 1XHApprovedDemolition of existing rear conservatory and construction of a single-storey rear extension, addition of cladding and alteration to fenestration.Received 8 Sep 202626/1790/FUL
- Southlea Lower Broad Oak Road West Hill Ottery St Mary EX11 1XHApprovedProposed rear/south extension in place of existing conservatory, new entrance door and canopy, cladding and raised patio to main dwelling; garage extension and roof alterations, including solar installationReceived 7 Sep 202626/1708/FUL
- Kings Gatchell Higher Metcombe Ottery St Mary EX11 1SLApprovedRe-roofing of property, addition of cladding and enlargement of existing dormer.Received 27 Aug 202626/1759/FUL
- 5 Pinefields Close West Hill Ottery St Mary EX11 1XLApprovedProposed demolition of existing lean to structure, alterations, construction of two storey rear extension and raised decking area with balustrade, addition of render, Proposed Conversion of existing garage into residential accommodation ; revision of approved application ref. 25/0672/FULReceived 17 Aug 202626/1413/FUL
Planning in Metcombe
- Approved
- 77%
- 10 of 10 decided
- Decision time
- about 5 weeks
- on average
Applications within 1 km of the centre of Metcombe in the last 24 months, from East Devon District Council's planning register.
Decided by East Devon District CouncilCouncil page
Around Metcombe
Postcode districts
EX11 128 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: East Devon District Council
For home projects and trades
- Architects in MetcombeFor planning applications, extensions and new builds.
- Building contractors in MetcombeLocal builders for approved plans and permitted development.
Builders and trades: get new Metcombe jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Metcombe
Metcombe is a settlement located in Devon, England.
Property prices in Metcombe show an average sale price of £431,904, based on 50 recent transactions recorded by HM Land Registry. There are currently no active flood warnings for the Metcombe area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Metcombe a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Metcombe has 6 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Metcombe planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
To comment on or object to a planning application near Metcombe, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 20 planning applications were submitted near Metcombe. Of these, 77% were approved, with an average decision time of 32 days.
The most common types were tree works (5), full planning applications (3), discharge of conditions (3).