Search Melbourn planning applications
15 applications received or decided in the last 90 days · within 1 km of the centre of Melbourn · updated daily · South Cambridgeshire District Council
- 65 Orchard Road Melbourn Cambridgeshire SG8 6BBAwaiting decisionErection of 5 no. dwellings to the rear and associated access from Orchard Road.Received 4 Nov 202626/04154/FUL
- 1 Drury Lane Melbourn Cambridgeshire SG8 6EPAwaiting decisionT1 Robinia - Remove to ground level.Received 4 Nov 202626/1297/TTCA
- 3 The Lawns Melbourn Cambridgeshire SG8 6BAAwaiting decisionT1 Sycamore Crown reduce by 4 metres (Previous pruning points)Received 4 Nov 202626/1267/TTPO
- 4 Greenbanks Melbourn Cambridgeshire SG8 6ASAwaiting decisionTwo storey front and side extensions and part single storey front extension.Received 2 Nov 202626/04119/HFUL
- 6 Little Lane Melbourn Cambridgeshire SG8 6BUAwaiting decisionPlum tree x 2 - Remove Plum tree 1 has snapped during the storm and is now laying on the clients roof, this will need full removal and Removal of a second plum tree which will be unsafe as it has grown at a 50-60 degree angle away from the main one. Once we remove the first one this will then become unsafe.Received 28 Oct 202626/1252/TTCA
Planning in Melbourn
- Approved
- 88%
- 23 of 24 decided
- Decision time
- about 7 weeks
- on average
Applications within 1 km of the centre of Melbourn in the last 24 months, from South Cambridgeshire District Council's planning register.
Decided by South Cambridgeshire District CouncilCouncil page
Around Melbourn
Postcode districts
SG8 601 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: South Cambridgeshire District Council
For home projects and trades
- Architects in MelbournFor planning applications, extensions and new builds.
- Building contractors in MelbournLocal builders for approved plans and permitted development.
Builders and trades: get new Melbourn jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Melbourn
Melbourn is a vibrant village located in the far south-west of Cambridgeshire, England, with a population exceeding 4,600 residents. The village features a traditional high street that is bypassed by the A10, providing easy access to nearby Royston, Hertfordshire, just 3 miles (4.8 km) away. As part of the South Cambridgeshire district, Melbourn presents various opportunities for planning applications in a well-connected community. The settlement has a population of approximately 4,900 (2021 estimate). It sits within the South Cambridgeshire district.
Melbourn covers an area of approximately 1490.0 km². The surrounding landscape and character of the area play an important role in how planning applications are assessed by the local authority.
Property prices in Melbourn show an average sale price of £425,178, based on 50 recent transactions recorded by HM Land Registry. There are currently no active flood warnings for the Melbourn area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Melbourn a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Melbourn planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
To comment on or object to a planning application near Melbourn, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 61 planning applications were submitted near Melbourn. Of these, 88% were approved, with an average decision time of 47 days.
The most common types were tree works (24), full planning applications (8), outline applications (8).