Search Markyate planning applications
24 applications received or decided in the last 12 months · within 1 km of the centre of Markyate · updated daily · Dacorum Borough Council
Only 4 applications in the last 90 days, so this shows the last 12 months.
- Land Between 33 And 39 Pickford Road Markyate St Albans Hertfordshire AL3 8RSAwaiting decisionDetails as required by Condition 2 (Materials) attached to planning permission 22/02531/FULReceived 23 Oct 202626/02343/DRC
- 90 Pickford Road Markyate Hertfordshire AL3 8RWAwaiting decisionConstruction of a new Self Build two storey two bedroom dwelling to the side of an existing house. Rear single storey extension to the existing house. Solar panels installed to the roof of the existing house and new dwelling. External works including adaption of the existing driveway and rear raised patio decking.Received 13 Oct 202626/02211/FUL
- Foxdell Farm Luton Road Markyate St Albans Hertfordshire AL3 8QDAwaiting decisionDemolition of commercial and equestrian buildings and farmhouse, and redevelopment for residential development of 12 dwellings with access, landscaping and associated worksReceived 17 Sep 202625/01092/MFA
- Cavendish House 30 High Street Markyate St Albans Hertfordshire AL3 8PBApprovedWorks to treesWorks to Tree(s) in Conservation AreaReceived 26 Aug 202626/01857/TCA
- 19 Ver Brook Avenue Markyate St Albans Hertfordshire AL3 8FHAwaiting decisionConfirmation that the planning conditions have been fully complied with for application reference 4/01773/11/MFAConfirmation of Discharged ConditionsReceived 6 Aug 202626/01733/CWC
Planning in Markyate
- Approved
- 80%
- 16 of 17 decided
- Decision time
- about 7 weeks
- on average
Applications within 1 km of the centre of Markyate in the last 24 months, from Dacorum Borough Council's planning register.
Decided by Dacorum Borough CouncilCouncil page
Around Markyate
Postcode districts
AL3 421 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Dacorum Borough Council
For home projects and trades
- Architects in MarkyateFor planning applications, extensions and new builds.
- Building contractors in MarkyateLocal builders for approved plans and permitted development.
Builders and trades: get new Markyate jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Markyate
Markyate is a charming village and civil parish located in north-west Hertfordshire, near the borders of Bedfordshire and Buckinghamshire. Its strategic position makes it a noteworthy area for planning applications, offering potential for development while maintaining its rural character.
There are currently no active flood warnings for the Markyate area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Markyate a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Markyate has 6 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Markyate planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Markyate, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 30 planning applications were submitted near Markyate. Of these, 80% were approved, with an average decision time of 47 days.
The most common types were full planning applications (9), discharge of conditions (4), tree works (3).
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).