Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

Maes-glas, Newport Planning Applications

Recent planning applications near Maes-glas, Newport.

Newport · Wales · settlement

View council

About Maes-glas

Maes-glas is a village located in the community of Holywell, Flintshire, in north-east Wales, near the River Dee estuary. The village had a population of 2,741 according to both the 2001 and 2011 censuses, indicating a stable demographic that may be relevant for planning applications in the area.

Enter a postcode to search for planning applications near Maes-glas.

Town Insights

Property Prices

Average property sale price: £253,918 (based on 50 recent transactions from HM Land Registry).

Area Information

  • Admin district: Newport
  • Parliamentary constituency: Newport West and Islwyn
  • LSOA: Newport 020F

Crime Statistics

0 crimes reported in 2026-02.

Flood Risk

No active flood warnings near Maes-glas.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near Maes-glas.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for Maes-glas based on the last 24 months of planning data.

Nearby Applications

1 planning application found near Maes-glas.

  1. - Tredegar Park Lodge Cardiff Road Newport South Wales NP10 8TF
    THE ALTERATION AND EXTENSION OF EXISTING BUILDINGS TO PROVIDE A CAFE, OFFICES, STORE AND PLANT ROOMS, TOGETHER WITH ASSOCIATED LANDSCAPE ALTERATIONS AND OUTDOOR SEATING AREA
    Status: Conditions | Type: Full | Council: Newport | Date: 2025-02-25
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of Maes-glas in Newport

Maes-glas is a village located in the community of Holywell, Flintshire, in north-east Wales, near the River Dee estuary. The village had a population of 2,741 according to both the 2001 and 2011 censuses, indicating a stable demographic that may be relevant for planning applications in the area.

Property prices in Maes-glas show an average sale price of £253,918, based on 50 recent transactions recorded by HM Land Registry.

There were no crimes reported in the immediate area during the most recent reporting period. This makes Maes-glas a particularly low-crime area.

For anyone interested in property development or monitoring local planning decisions, Maes-glas planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in Maes-glas

In the last 24 months, 8 planning applications were submitted near Maes-glas. Of these, 50% were approved, with an average decision time of 70 days.

This is below the national average of approximately 87%, which may reflect stricter local policies, sensitivity of the area, or higher levels of speculative applications. Pre-application advice is particularly worthwhile near Maes-glas.

At 70 days on average, decisions near Maes-glas slightly exceed the 8-week statutory target for minor applications, though this is common across many councils.

The most common application types near Maes-glas were full planning applications (5), discharge of conditions (2), outline applications (1). Full planning applications account for 63% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.

In terms of development scale, 2 medium-scale applications, 6 smaller schemes were submitted.

Nearby Towns

Explore planning applications in nearby areas:

  • Duffryn planning applications
  • Gaer planning applications
  • Level of Mendalgief planning applications
  • Stelvio planning applications
  • Caerau Park planning applications
  • Stow Park planning applications
  • Glasllwch planning applications
  • Pye Corner planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account