Search Lower Tuffley planning applications
44 applications received or decided in the last 12 months · within 1 km of the centre of Lower Tuffley · updated daily · Gloucester City Council
Only 9 applications in the last 90 days, so this shows the last 12 months.
- 5 Rissington Road Gloucester GL4 0HPAwaiting decisionProposed Single Storey Extension at Rear of DwellingReceived 2 Nov 202626/00956/FUL
- 47 Holmwood Drive Gloucester GL4 0PNAwaiting decisionTwo storey side extension and alterations to propertyReceived 10 Sep 202626/00829/FUL
- WHP Telecoms GLO077 Pole And Cabinet East Of 16 Holmleigh Road GloucesterAwaiting decisionRemoval of existing 17m high phase 9 pole supporting h3g equipment and replacement with a 20m high phase 7.3 pole supporting h3g & vmo2 equipment with a wraparound cabinet at its base, removal of rbs6130 cabinet and replacement with 6170 cabinet, installation of 1no. Half bowler cabinet, internal cabinet worksReceived 7 Sep 202626/00814/TCM
- 399 Stroud Road Gloucester GL4 0DBAwaiting decisionSingle storey front & rear extensionReceived 2 Sep 202626/00772/FUL
- 10 Gainsborough Drive Gloucester GL4 0QRApprovedProposed Extension and alteration to propertyFullReceived 28 Aug 2026Decided 4 Aug 202626/00792/FUL
Planning in Lower Tuffley
- Approved
- 85%
- 23 of 27 decided
- Decision time
- about 6 weeks
- on average
Applications within 1 km of the centre of Lower Tuffley in the last 24 months, from Gloucester City Council's planning register.
Decided by Gloucester City CouncilCouncil page
Around Lower Tuffley
Postcode districts
GL4 242 applications in the last 12 monthsGL2 346 applications in the last 12 monthsGL1 266 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Gloucester City Council
For home projects and trades
- Architects in Lower TuffleyFor planning applications, extensions and new builds.
- Building contractors in Lower TuffleyLocal builders for approved plans and permitted development.
Builders and trades: get new Lower Tuffley jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Lower Tuffley
Lower Tuffley is a suburb located in the city of Gloucester, Gloucestershire. This unparished area lies in close proximity to Robinswood Hill, making it an appealing location for potential planning applications and developments within the city.
Property prices in Lower Tuffley show an average sale price of £276,339, based on 50 recent transactions recorded by HM Land Registry. There are currently no active flood warnings for the Lower Tuffley area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Lower Tuffley a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Lower Tuffley has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Lower Tuffley planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
To comment on or object to a planning application near Lower Tuffley, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 59 planning applications were submitted near Lower Tuffley. Of these, 85% were approved, with an average decision time of 43 days.
The most common types were telecoms (5), outline applications (2), full planning applications (1).