Search Lowedges planning applications
26 applications received or decided in the last 12 months · within 1 km of the centre of Lowedges · updated daily · Sheffield City Council
Only 7 applications in the last 90 days, so this shows the last 12 months.
- 96 Gervase Drive Sheffield S8 7PNAwaiting decisionErection of two/single-storey rear extension to dwellinghouseFull Planning ApplicationReceived 12 Oct 202626/03047/FUL
- 98 Gervase Drive Sheffield S8 7PNAwaiting decisionErection of a dwellinghouse, and alterations to dwellinghouse (98 Gervase Drive) including erection of two-storey rear extension and dormer extension to rearFull Planning ApplicationReceived 12 Oct 202626/03045/FUL
- 106 Gervase Drive Sheffield S8 7PNAwaiting decisionSingle-storey rear extension to dwellinghouse - the extension is 4.30 metres from the rear of the original dwellinghouse, ridge height no more than 3.20 metres and the height of the eaves is 3.00 metresReceived 5 Oct 202626/02870/HPN
- 150 Lowedges Road Sheffield S8 7LFAwaiting decisionSingle-storey rear extension - the extension will be 4.30 metres from the rear of the original dwellinghouse, ridge height no more than 3.25 metres and height to the eaves of 2.88 metresReceived 1 Oct 202626/02833/HPN
- 184 Westwick Road Sheffield S8 7BZAwaiting decisionApplication for a Lawful Development Certificate for alterations to roof of dwellinghouse including hip to gable extension, erection of dormer extension to rear, rooflights and solar panels to front (Application under Section 192)OutlineReceived 1 Sep 202626/02581/LD2
Planning in Lowedges
- Approved
- 80%
- 16 of 19 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Lowedges in the last 24 months, from Sheffield City Council's planning register.
Decided by Sheffield City CouncilCouncil page
Around Lowedges
Postcode districts
S8 187 applications in the last 12 monthsS18 137 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Sheffield City Council
For home projects and trades
- Architects in LowedgesFor planning applications, extensions and new builds.
- Building contractors in LowedgesLocal builders for approved plans and permitted development.
Builders and trades: get new Lowedges jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Lowedges
Lowedges is a district in Sheffield, South Yorkshire, known for its residential areas and local amenities. This suburb combines a sense of community with access to nearby green spaces, making it an appealing location for planning applications related to housing and development. Its proximity to Sheffield city centre further enhances its attractiveness for potential projects.
There are currently no active flood warnings for the Lowedges area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Lowedges a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Lowedges has 4 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Lowedges planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Lowedges, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 36 planning applications were submitted near Lowedges. Of these, 80% were approved, with an average decision time of 58 days.
The most common types were outline applications (7), full planning applications (4), amendments (3).