Skip to content

Planning in London Beach

Approved
94%
15 of 16 decided
Decision time
about 6 weeks
on average

Applications within 1 km of the centre of London Beach in the last 24 months, from Ashford Borough Council's planning register.

Decided by Ashford Borough CouncilCouncil page

Around London Beach

Postcode districts

TN30 91 applications in the last 12 monthsTN26 147 applications in the last 12 months

Applications in each district in the last 12 months.

Planning authority: Ashford Borough Council

For home projects and trades

About London Beach

London Beach is a settlement located in Kent, England.

There are currently no active flood warnings for the London Beach area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.

In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (February 2026). This makes London Beach a particularly low-crime area, which is often reflected in its desirability and property values.

The area around London Beach has 21 nature designations nearby, which may affect how planning applications are assessed.

For anyone interested in property development or monitoring local planning decisions, London Beach planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

To comment on or object to a planning application near London Beach, open it in the list above: each one links to the council's own page for it and shows any comment deadline.

In the last 24 months, 18 planning applications were submitted near London Beach. Of these, 94% were approved, with an average decision time of 44 days.

The most common types were discharge of conditions (5), full planning applications (4), amendments (3).

1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).

Common questions

How many planning applications have been submitted near London Beach?
In the last 24 months, 18 planning applications were submitted near London Beach. The approval rate is 94%.
How long do planning decisions take near London Beach?
The average planning decision time near London Beach is 44 days. The statutory target is 8 weeks (56 days) for minor applications and 13 weeks for major applications.
What is the planning approval rate near London Beach?
The planning approval rate near London Beach is 94%. The national average across England and Wales is 87%.
What types of planning applications are most common near London Beach?
The most common type of planning application near London Beach is discharge of conditions, with 5 submissions in the last 24 months.
How can I track planning applications near London Beach?
You can search and track planning applications near London Beach on Planning Signal. Create a free account to save searches, watch specific applications, and receive email alerts when new plans are submitted nearby.