Search Lee Bank planning applications
65 applications received or decided in the last 90 days · within 1 km of the centre of Lee Bank · updated daily · Birmingham City Council
- 20-39 Snow Hill, Queensway, Birmingham, B4 6WRAwaiting decisionApplication for a lawful development certificate to confirm the demolition works undertaken at the site constitute material operations that were carried out lawfully and therefore that planning permission ref. 2022/08119/PA, granted on 5 December 2023 has been lawfully implementedExisting Lawful Use/DevelopmentReceived 23 Oct 20262026/06376/PA
- 55 Fifth Floor, Colmore Row, Birmingham, B3 2AAAwaiting decisionApplication to determine details for condition number 2 (stone and mortar details) attached to listed building consent 2026/01036/PA.Discharge Of ConditionReceived 8 Oct 20262026/06115/PA
- 55 Fifth Floor, Colmore Row, Birmingham, B3 2AAAwaiting decisionApplication to determine details for condition number 1 (method statement for repair works) attached to listed building consent 2026/01036/PADischarge Of ConditionReceived 8 Oct 20262026/06114/PA
- 44-80 Corporation Street (Martineau Place) Birmingham B2 4UQAwaiting decisionOutline planning application for the demolition of existing buildings and the creation of a new mixed-use development comprising residential (Use Class C3); office and workspace (Use Class E(g)); retail and food and beverage (Use Class E(a, b, c)); community use(s) (Use Class F); leisure (sui generis); and associated infrastructure, public realm, landscaping, access, cycle parking, accessible parking and servicing. All matters are reserved other than landscaping for Union Street and the matters of scale; siting; and appearance relating to two buildings.OutlineReceived 7 Oct 20262026/06157/PA
- Land bound by Moat Lane and Bradford Street, Rea Street, Pershore Street and Edgbaston Street Birmingham B5 5BDAwaiting decisionDischarge of condition 27 (demolition and construction ecological management plan) attached to planning approval 2022/09643/PAReserved Matters DevelopmentReceived 6 Oct 20262026/06049/PA
Planning in Lee Bank
- Approved
- 88%
- 156 of 172 decided
- Decision time
- about 13 weeks
- on average
Applications within 1 km of the centre of Lee Bank in the last 24 months, from Birmingham City Council's planning register.
Decided by Birmingham City CouncilCouncil page
Around Lee Bank
Postcode districts
B1 42 applications in the last 12 monthsB3 32 applications in the last 12 monthsB5 51 applications in the last 12 monthsB2 21 applications in the last 12 monthsB4 39 applications in the last 12 monthsB15 87 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Birmingham City Council
For home projects and trades
- Architects in Lee BankFor planning applications, extensions and new builds.
- Building contractors in Lee BankLocal builders for approved plans and permitted development.
Builders and trades: get new Lee Bank jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Lee Bank
Lee Bank is an inner-city area located in Birmingham, England, falling within the Edgbaston and Ladywood wards. Positioned inside the Middle Ring Road, it serves as a significant part of the urban landscape surrounding Central Birmingham, making it relevant for various planning applications and development projects.
There are currently no active flood warnings for the Lee Bank area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Lee Bank a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Lee Bank planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Lee Bank, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 215 planning applications were submitted near Lee Bank. Of these, 88% were approved, with an average decision time of 93 days.
The most common types were discharge of conditions (50), full planning applications (32), advertising consent (32). 6 large-scale developments were submitted during this period.
3 planning appeals were lodged, of which 1 was allowed and 2 were dismissed (33% success rate).