Search Hambledon planning applications
10 applications received or decided in the last 90 days · within 1 km of the centre of Hambledon · updated daily · Winchester City Council
- Woodlands East Street Hambledon Waterlooville Hampshire PO7 4RXAwaiting decisionT1 silver birch - reduce height by 2.5 width by 2m T2 silver birch -reduce height by 2.5 width by 1m T3 conifer - reduce height by 1.5m T4 silver birch - reduce height by 3m T5 golden macrocarpa - remover wisteria and reduce height by 1.5m T6 and T7 conifer - reduce lenders by 1.5mReceived 28 Oct 202626/02283/TPC
- Bittles Barn Fareham Road Hambledon Waterlooville Hampshire PO7 4QWAwaiting decisionReplacement of oil-fired boiler with an external air source heat pump, utilising the existing flue opening for installation (no new external wall penetration).Received 27 Oct 202626/02090/HOU
- White Gables East Street Hambledon Hampshire PO7 4RXAwaiting decisionT1 Fell beech tree to ground level due to advise as per supplied arb report.Tree in a Conservation AreaReceived 21 Oct 2026SDNP/26/04072/TCA
- Rosemead Vicarage Lane Hambledon Hampshire PO7 4RPAwaiting decisionInstallation of ev charger in front garden/hardstanding of propertyReceived 5 Oct 2026SDNP/26/03835/LIS
- Rosemead Vicarage Lane Hambledon Hampshire PO7 4RPAwaiting decisionInstallation of ev charger in front garden/hardstanding of propertyReceived 5 Oct 2026SDNP/26/03757/HOUS
Planning in Hambledon
- Approved
- 94%
- 33 of 35 decided
- Decision time
- about 7 weeks
- on average
Applications within 1 km of the centre of Hambledon in the last 24 months, from Winchester City Council's planning register.
Decided by Winchester City CouncilCouncil page
Around Hambledon
Postcode districts
PO7 221 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Winchester City Council
For home projects and trades
- Architects in HambledonFor planning applications, extensions and new builds.
- Building contractors in HambledonLocal builders for approved plans and permitted development.
Builders and trades: get new Hambledon jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Hambledon
Hambledon is a quaint village and civil parish located in Hampshire, England, approximately 10 miles (16 km) north of Portsmouth. Nestled within the scenic South Downs National Park, it offers a unique blend of rural charm and natural beauty, making it an attractive area for planning applications related to residential and commercial development. The settlement has a population of approximately 1,030 (2021 estimate). It sits within the Winchester district.
Property prices in Hambledon show an average sale price of £416,500, based on 50 recent transactions recorded by HM Land Registry.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Hambledon a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Hambledon has 17 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Hambledon planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications. Further local information can be found on the community website at http://www.hambledon-hants.com/.
Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
To comment on or object to a planning application near Hambledon, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 56 planning applications were submitted near Hambledon. Of these, 94% were approved, with an average decision time of 49 days.
The most common types were tree works (14), discharge of conditions (7), full planning applications (5).