Search Hackney planning applications
191 applications received or decided in the last 90 days · within 1 km of the centre of Hackney · updated daily · London Borough of Hackney
- 8 Lavender Grove, Hackney, London, E8 3LUAwaiting decisionReplacement of existing single glazed timber framed sash windows to front elevation with double glazed timber framed sash windows; replacement of existing single glazed timber framed sash and casement windows to rear elevations with double glazed timber framed sash and casement windows; replacement of existing single glazed timber framed rear door with new double glazed timber framed doorFull Planning PermissionReceived 29 Oct 20262026/1867
- 3 Central Way, Oxted, Surrey, RH8 0LSAwaiting decisionConstruction of a hip-to-gable loft conversion with rear dormer, a 3m deep single-storey rear extension, and a double-storey side extension.Householder planningReceived 28 Oct 20262026/1269
- Bowling Green, HACKNEY DOWNS PARK Downs Park Road, HackneyAwaiting decisionNon-material amendment of planning permission ref: 2023/2180 (dated 19/12/2024) for "Extension to existing building with new hard surfacing boundary treatments and cycle store relating to the existing park depot at Hackney Downs." Amendment...Received week of 26 Oct 20262026/2267
- Bowling Green, HACKNEY DOWNS PARK Downs Park Road, HackneyAwaiting decisionSubmission of details pursuant to condition 7 (CMP) attached to planning permission ref: 2023/2180 (decision date 19/12/2024)Received week of 26 Oct 20262026/2268
- 63 Clarence Mews, Hackney, London, E5 8HLAwaiting decisionApproval of details pursuant to condition 3 (Windows) of planning permission 2025/2230 dated 29-01-2026Received week of 26 Oct 20262026/2285
Planning in Hackney
- Approved
- 83%
- 725 of 843 decided
- Decision time
- about 12 weeks
- on average
Applications within 1 km of the centre of Hackney in the last 24 months, from London Borough of Hackney's planning register.
Decided by London Borough of HackneyCouncil page
Around Hackney
Postcode districts
E8 471 applications in the last 12 monthsE9 314 applications in the last 12 monthsE5 378 applications in the last 12 monthsE2 302 applications in the last 12 monthsN1 1,375 applications in the last 12 monthsEC2A 118 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: London Borough of Hackney
For home projects and trades
- Architects in HackneyFor planning applications, extensions and new builds.
- Building contractors in HackneyLocal builders for approved plans and permitted development.
Builders and trades: get new Hackney jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Hackney
Hackney is a town located in Hackney - Greater London, England.
There are currently no active flood warnings for the Hackney area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Hackney a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Hackney planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Hackney, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 1,210 planning applications were submitted near Hackney. Of these, 83% were approved, with an average decision time of 83 days.
The most common types were full planning applications (68), tree works (38), discharge of conditions (28). 2 large-scale developments were submitted during this period.
18 planning appeals were lodged, of which 9 were allowed and 8 were dismissed (53% success rate).