Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

Green End (MK42), Bedfordshire Planning Applications

Recent planning applications near Green End (MK42), Bedfordshire.

Bedfordshire · England · settlement

Planning applications in Green End (MK42) are administered by Bedford Borough Council. View the full Bedford Borough Council planning applications page for approval rates and decision timelines.

Enter a postcode to search for planning applications near Green End (MK42).

Town Insights

Property Prices

Average property sale price: £357,130 (based on 50 recent transactions from HM Land Registry).

Area Information

  • Admin district: Bedford
  • Parliamentary constituency: Mid Bedfordshire
  • LSOA: Bedford 022C

Crime Statistics

0 crimes reported in 2026-05.

Flood Risk

No active flood warnings near Green End (MK42).

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near Green End (MK42).

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for Green End (MK42) based on the last 24 months of planning data.

Nearby Applications

3 planning applications found near Green End (MK42).

  1. - 28 Ibbett Close Kempston Rural Bedford Bedfordshire MK43 9BU
    T1 Ash tree - Reduce stem that hangs over summer house and reduce remainder of tree by 4 metres all around.
    Status: Permitted | Type: Trees | Council: Bedford | Date: 2025-11-25
    View full details
  2. - 9 Basen Close Kempston Bedford Bedfordshire MK42 7FG
    Loft conversion with front and rear roof lights, front window and second floor side windows
    Status: Undecided | Type: Full | Council: Bedford | Date: 2025-11-19
    View full details
  3. - Meadowview House 60 Green End Road Kempston Bedford Bedfordshire MK43 8RJ
    Two storey front extension, amendment to roof over existing annexe and change of facing materials.
    Status: Undecided | Type: Full | Council: Bedford | Date: 2023-06-16
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of Green End (MK42) in Bedfordshire

Green End (MK42) is a settlement located in Bedfordshire, England.

Property prices in Green End (MK42) show an average sale price of £357,130, based on 50 recent transactions recorded by HM Land Registry.

There were no crimes reported in the immediate area during the most recent reporting period. This makes Green End (MK42) a particularly low-crime area.

Green End (MK42) has one conservation area within its boundaries: Kempston. Planning applications within or near this conservation area are subject to additional scrutiny to preserve the architectural and historic character of the area. Homeowners and developers should be aware that permitted development rights may be restricted.

For anyone interested in property development or monitoring local planning decisions, Green End (MK42) planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in Green End (MK42)

In the last 24 months, 6 planning applications were submitted near Green End (MK42). Of these, 100% were approved, with an average decision time of 74 days.

This is notably above the national average of approximately 87%, suggesting a relatively permissive planning environment. Applicants near Green End (MK42) may find that well-prepared applications have a strong chance of success.

The average decision period of 74 days exceeds the 8-week target for minor applications but falls within the 13-week target for major schemes. Applicants should plan for approximately 11 weeks from submission to decision.

The most common application types near Green End (MK42) were full planning applications (2), outline applications (2), tree works (2). Full planning applications account for 33% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.

In terms of development scale, 1 medium-scale application, 5 smaller schemes were submitted.

1 planning appeal was lodged, of which 1 was allowed and 0 were dismissed (100% success rate). This relatively high appeal success rate suggests that the local authority may be refusing some applications that the Planning Inspectorate considers acceptable.

Nearby Towns

Explore planning applications in nearby areas:

  • Kempston Church End planning applications
  • Wood End planning applications
  • Gibraltar planning applications
  • Keeley Green planning applications
  • Box End planning applications
  • Kempston West End planning applications
  • Kempston planning applications
  • Wootton planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account