Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

East Moor, West Yorkshire Planning Applications

Recent planning applications near East Moor, West Yorkshire.

West Yorkshire · England · settlement

View council

Enter a postcode to search for planning applications near East Moor.

Town Insights

Property Prices

Average property sale price: £250,889 (based on 50 recent transactions from HM Land Registry).

Area Information

  • Admin district: Wakefield
  • Parliamentary constituency: Wakefield and Rothwell
  • LSOA: Wakefield 006C

Crime Statistics

0 crimes reported in 2026-02.

Flood Risk

No active flood warnings near East Moor.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near East Moor.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for East Moor based on the last 24 months of planning data.

Nearby Applications

4 planning applications found near East Moor.

  1. 26/00581/GPD - 79 Irwin Crescent Wakefield WF1 4QX
    Single storey rear extension with a maximum projection of 6.0m, a maximum height of 4.0m and a maximum eaves height of 2.9m
    Status: Undecided | Council: Wakefield Metropolitan | Date: 2026-04-10
  2. - 79 Irwin Crescent Wakefield WF1 4QX
    Single storey rear extension with a maximum projection of 6.0m, a maximum height of 4.0m and a maximum eaves height of 2.9m
    Status: Undecided | Type: Outline | Council: Wakefield | Date: 2026-04-07
    View full details
  3. 26/00522/FUL - 67 Irwin Crescent Wakefield WF1 4QX
    Shed on driveway (Retrospective) and 1.5m high fencing to front
    Status: Undecided | Council: Wakefield Metropolitan | Date: 2026-03-26
  4. - 66 Windhill Road Wakefield WF1 4DD
    Single storey rear extension with a maximum projection of 4.1m, a maximum height of 3.9m and a maximum eaves height of 2.8m
    Status: Undecided | Type: Outline | Council: Wakefield | Date: 2026-02-26
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of East Moor in West Yorkshire

East Moor is a settlement located in West Yorkshire, England.

Property prices in East Moor show an average sale price of £250,889, based on 50 recent transactions recorded by HM Land Registry.

There were no crimes reported in the immediate area during the most recent reporting period. This makes East Moor a particularly low-crime area.

East Moor has one conservation area within its boundaries: No data available for publication by HE. Planning applications within or near this conservation area are subject to additional scrutiny to preserve the architectural and historic character of the area. Homeowners and developers should be aware that permitted development rights may be restricted.

Ecology & Nature Designations

The area around East Moor includes 1 Ancient Woodland site. These designations may affect planning decisions, as proposals near protected sites require environmental impact assessment and may face additional restrictions.

For anyone interested in property development or monitoring local planning decisions, East Moor planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in East Moor

In the last 24 months, 24 planning applications were submitted near East Moor. Of these, 67% were approved, with an average decision time of 62 days.

This is below the national average of approximately 87%, which may reflect stricter local policies, sensitivity of the area, or higher levels of speculative applications. Pre-application advice is particularly worthwhile near East Moor.

At 62 days on average, decisions near East Moor slightly exceed the 8-week statutory target for minor applications, though this is common across many councils.

The most common application types near East Moor were discharge of conditions (5), full planning applications (3), outline applications (2).

In terms of development scale, 1 large-scale (major) development, 14 smaller schemes were submitted.

Nearby Towns

Explore planning applications in nearby areas:

  • Newton Hill planning applications
  • Wakefield planning applications
  • Belle Vue planning applications
  • Agbrigg planning applications
  • Heath Common planning applications
  • Stanley Ferry planning applications
  • Stanley planning applications
  • Sandal Magna planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account