Search East Farleigh planning applications
10 applications received or decided in the last 12 months · within 1 km of the centre of East Farleigh · updated daily · Maidstone Borough Council
Only 2 applications in the last 90 days, so this shows the last 12 months.
- 1 Rectory Lane Barming Kent ME16 9BEAwaiting decisionDemolition of existing conservatory. Erection of replacement single storey rear extension.Received 2 Nov 202626/504020/FULL
- 1 Mays Paddock Lower Road East Farleigh Kent ME15 0JSAwaiting decisionSubmission of details pursuant to condition 6-(enhancement of biodiversity), 8-(landscape scheme), 10-(foul sewage and surface water disposal measures), 12-(watching brief) subject to 23/502488/FULLSubmission of DetailsReceived 5 Aug 202626/502986/SUB
- Hill House Station Hill East Farleigh Kent ME15 0JDApprovedChange of use of existing ground floor retail unit to residential use associated with the existing dwelling above.FullReceived 3 Aug 2026Decided 28 Sep 202626/502919/FULL
- Bees Cottage Lower Road East Farleigh Kent ME15 0HDAwaiting decisionSection 73 - Application for minor material amendment to approved plans condition 2 (to allow the external wall to be finished in horizontal cement based weatherboard) pursuant to 25/502672/FULL for - Erection of a first floor rear extension with a Juliet balcony and changes to fenestration.FullReceived 10 Apr 202626/501371/FULL
- Bridge House Station Hill East Farleigh Kent ME15 0JGApprovedListed Building Consent to reuse the existing stone/rubble and rebuild damaged section of the ragstone wall and repair fractures back to its original condition, also replace two damaged/moved gate posts with new and re-hang the existing gate.Listed Building ConsentReceived 23 Mar 2026Decided 18 May 202626/501095/LBC
Planning in East Farleigh
- Approved
- 92%
- 22 of 24 decided
- Decision time
- about 7 weeks
- on average
Applications within 1 km of the centre of East Farleigh in the last 24 months, from Maidstone Borough Council's planning register.
Decided by Maidstone Borough CouncilCouncil page
Around East Farleigh
Postcode districts
ME15 326 applications in the last 12 monthsME16 216 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Maidstone Borough Council
For home projects and trades
- Architects in East FarleighFor planning applications, extensions and new builds.
- Building contractors in East FarleighLocal builders for approved plans and permitted development.
Builders and trades: get new East Farleigh jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About East Farleigh
East Farleigh is a picturesque village and civil parish situated in the Maidstone district of Kent, England. Located on the southern bank of the River Medway, it lies approximately two miles upstream from Maidstone, making it an appealing area for potential planning applications due to its proximity to urban amenities while retaining a rural charm. The settlement has a population of approximately 1,431 (2021 estimate). It sits within the Maidstone district.
The area around East Farleigh has 8 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, East Farleigh planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near East Farleigh, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 30 planning applications were submitted near East Farleigh. Of these, 92% were approved, with an average decision time of 51 days.
The most common types were full planning applications (9), tree works (8), discharge of conditions (6). 1 large-scale development was submitted during this period.