Search East Anton planning applications
19 applications received or decided in the last 12 months · within 1 km of the centre of East Anton · updated daily · Test Valley Borough Council
Only 6 applications in the last 90 days, so this shows the last 12 months.
- Finkley Down Farm Finkley Road Finkley Andover Hampshire SP11 6NFAwaiting decisionT0624 - Lime - Remove deadwood from the southeastern mid crown, remove to ground/source the basal suckers, Tree E - Horse Chestnut - Crown Lift and reduce to create a 0.5m clear space between the crown edge and the roof line, utility cables and fence, Tree F - Lime - Crown lift and reduce In order to create a 0.5m clear space between the crown edge and the fences, canopy 2.5m crown lift over trackReceived 2 Nov 202626/02434/TPON
- 39 Olympic Park Road Andover Hampshire SP11 6RXAwaiting decisionErection of a single storey side extensionReceived 22 Oct 202626/02357/FULLN
- 1 Sutcliffe Square Andover Hampshire SP10 5EAApprovedConstruction of a single storey rear extension and alterations to fenestrationReceived 28 Sep 2026Decided 2 Nov 202626/02097/FULLN
- 50 Genoa Court Andover Hampshire SP10 5JBApprovedProposed replacement solid roof and glazing to existing rear conservatoryReceived 22 Sep 2026Decided 2 Nov 202626/02051/FULLN
- 1 Shears Road Andover Hampshire SP11 6DYApprovedReplacement solid roof to rear conservatoryFullReceived 28 Aug 2026Decided 14 Oct 202626/01885/FULLN
Planning in East Anton
- Approved
- 91%
- 20 of 22 decided
- Decision time
- about 11 weeks
- on average
Applications within 1 km of the centre of East Anton in the last 24 months, from Test Valley Borough Council's planning register.
Decided by Test Valley Borough CouncilCouncil page
Around East Anton
Postcode districts
SP10 204 applications in the last 12 monthsSP11 519 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Test Valley Borough Council
For home projects and trades
- Architects in East AntonFor planning applications, extensions and new builds.
- Building contractors in East AntonLocal builders for approved plans and permitted development.
Builders and trades: get new East Anton jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About East Anton
East Anton is a developing suburb of Andover in the Test Valley district of Hampshire, situated 1.5 miles (2.1 km) northeast of the town centre. Originally a hamlet consisting of two farms and associated buildings, it has transformed into a modern housing estate, making it a focal point for planning applications in the area. It sits within the Smannell district.
There are currently no active flood warnings for the East Anton area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes East Anton a particularly low-crime area, which is often reflected in its desirability and property values.
The area around East Anton has 2 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, East Anton planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near East Anton, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 27 planning applications were submitted near East Anton. Of these, 91% were approved, with an average decision time of 74 days.
The most common types were full planning applications (10), tree works (3), outline applications (2). 2 large-scale developments were submitted during this period.