Search Earith planning applications
14 applications received or decided in the last 12 months · within 1 km of the centre of Earith · updated daily · Huntingdonshire District Council
Only 3 applications in the last 90 days, so this shows the last 12 months.
- 15 Bridge End Earith Huntingdon PE28 3RBAwaiting decisionTo pollard white Willow tree by 4.5m to prevent further decayReceived 20 Oct 202626/01856/TREE
- 140 Greenfields Earith Huntingdon PE28 3QZApprovedErection of single storey side extension.Householder (Full)Received 17 Aug 2026Decided 22 Oct 202626/01500/HHFUL
- River Grange 40 High Street Earith Huntingdon PE28 3PPAwaiting decisionPruning and shaping of two Horse Chestnuts - reduce by 3-4 meters.Works to Protected TreeReceived 11 Aug 202626/01459/TREE
- 18 Cooks Drove Earith Huntingdon PE28 3QGApprovedReplacement roof including dormer windows to create first floor living accommodationHouseholder (Full)Received 29 Jul 2026Decided 25 Sep 202626/01380/HHFUL
- 15 High Street Earith Huntingdon PE28 3PPAwaiting decisionT1 - Spruce - Crown lift first metre of branches to approximately 4 metres from the ground. T2 - Pine - Remove lowest limb over left/western boundary and reduce back large low limb overhanging footpath and neighbours garden by approximately 2-3 metres. T3 - Red Oak - Crown reduce by 1-1.5 metres.Works to Tree in Con AreaReceived 7 May 202626/00841/TRCA
Planning in Earith
- Approved
- 63%
- 10 of 13 decided
- Decision time
- about 10 weeks
- on average
Applications within 1 km of the centre of Earith in the last 24 months, from Huntingdonshire District Council's planning register.
Decided by Huntingdonshire District CouncilCouncil page
Around Earith
Postcode districts
PE28 589 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Huntingdonshire District Council
For home projects and trades
- Architects in EarithFor planning applications, extensions and new builds.
- Building contractors in EarithLocal builders for approved plans and permitted development.
Builders and trades: get new Earith jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Earith
Earith is a charming village and civil parish located in Huntingdonshire, Cambridgeshire, approximately 10 miles east of Huntingdon. Nestled along the River Great Ouse, it features two significant artificial diversion channels, the Old Bedford River and the New Bedford River, which direct water towards the Denver Sluice. With a population that decreased from 1,677 in 2001 to 1,606 in 2011, Earith offers a unique blend of rural character and historical significance, making it an interesting area for planning applications and development inquiries. The settlement has a population of approximately 1,651 (2021 estimate). It sits within the Huntingdonshire district.
There are currently no active flood warnings for the Earith area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Earith a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Earith has 5 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Earith planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Earith, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 25 planning applications were submitted near Earith. Of these, 63% were approved, with an average decision time of 73 days.
The most common types were full planning applications (7), tree works (6), discharge of conditions (4).