Search Dunnose planning applications
14 applications received or decided in the last 12 months · within 1 km of the centre of Dunnose · updated daily · Isle of Wight Council
Only 5 applications in the last 90 days, so this shows the last 12 months.
- Pitts Keep The Pitts Ventnor Isle Of Wight PO38 1NTAwaiting decisionVariation of condition 2 on 24/01602/HOU to allow alterations to first floor and roof levelReceived 30 Oct 202626/01513/RVC
- Compton Undermount Bonchurch Village Road Ventnor Isle Of Wight PO38 1RGAwaiting decisionT1; Bay Tree - Fell to near ground level. The stump will then be assessed for removal.Received 15 Oct 202626/01436/TW
- Flat 1 Cliff House Bonchurch Shute Ventnor Isle Of Wight PO38 1NUApprovedT1; Cherry - Reduce by approximately 30% to good growth points. T2; Sycamore - Fell to near ground level. Reason: Oversized for location (too close to old stone boundary wall).Received 21 Sep 2026Decided 4 Nov 202626/01318/TW
- Rosecliff Lodge Luccombe Chine Shanklin Isle Of Wight PO37 6RHApprovedProposed single storey side extensionReceived 29 Jul 2026Decided 26 Oct 202626/00822/HOU
- St Boniface Church Bonchurch Shute Ventnor Isle Of Wight PO36 1NUApproved**5 Day Notice** Beech tree - 40-50% reduction for safety. Reason: Half the tree already snapped out.Tree Works (Five Day Notice)Received 8 Jul 2026Decided 16 Jul 202626/00922/TW
Planning in Dunnose
- Approved
- 90%
- 19 of 20 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Dunnose in the last 24 months, from Isle of Wight Council's planning register.
Decided by Isle of Wight CouncilCouncil page
Around Dunnose
Postcode districts
PO38 201 applications in the last 12 monthsPO37 73 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Isle of Wight Council
For home projects and trades
- Architects in DunnoseFor planning applications, extensions and new builds.
- Building contractors in DunnoseLocal builders for approved plans and permitted development.
Builders and trades: get new Dunnose jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Dunnose
Dunnose is a prominent cape located on the Isle of Wight, serving as a significant navigational landmark in the English Channel. Its historical importance is underscored by its role as a base point for two triangulations of Great Britain, with surveyed lines extending north to Clifton in Yorkshire, which have been essential for accurately determining the positions of locations across the country. This geographical feature may be relevant for planning applications in coastal and navigational contexts.
There are currently no active flood warnings for the Dunnose area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Dunnose a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Dunnose has 11 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Dunnose planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Dunnose, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 26 planning applications were submitted near Dunnose. Of these, 90% were approved, with an average decision time of 57 days.
The most common types were tree works (10), discharge of conditions (4), full planning applications (3).
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).