Search Dunk's Green planning applications
14 applications received or decided in the last 90 days · within 1 km of the centre of Dunk's Green · updated daily · Tonbridge and Malling Borough Council
- 1 Hamptons Road Hadlow Tonbridge Kent TN11 9REAwaiting decisionDemolition of existing garage and canopy link and provision of a two-storey side extension and a single storey rear extension with attached raised terraceReceived 16 Oct 202626/01850/FL
- Hamptons Park Road Hadlow Tonbridge Kent TN11 9SRAwaiting decision1x Mature Cherry (applicant ref T1) - Remove to ground level. 1x Mature Holm Oak (applicant ref T2)- Heavily reduce the tree by 40% (8 to 10 m)Received 12 Oct 202626/01922/TNCA
- Ash Tree Cottage School Lane Shipbourne Tonbridge Kent TN11 9RTAwaiting decisionSingle storey rear extensionReceived 30 Sep 202626/01822/FL
- Farm Building East Of Stable Court Roughway Lane Roughway Tonbridge KentAwaiting decisionSection 73 application to vary condition 2 (Plans List) of planning permission TM/25/02022/FL (Demolition of agricultural barn and erection of 2no. residential dwellings with associated car barn, parking and landscaping) for minor amendments to the external elevationsPlanning PermissionReceived 28 Aug 202626/01603/FL
- Woodbine House Roughway Lane Roughway Tonbridge Kent TN11 9SHApprovedProposed Removal of the current unsightly 1960s flat roof to the left of the front door and the current flat roof porch. Construct an open porch to the front (north) elevation. The addition of three new windows also on the front (north) elevation to match existing windows, and a small additional window on the rear (south) elevationReceived 20 Aug 2026Decided 3 Nov 202626/01558/FL
Planning in Dunk's Green
- Approved
- 87%
- 45 of 51 decided
- Decision time
- about 10 weeks
- on average
Applications within 1 km of the centre of Dunk's Green in the last 24 months, from Tonbridge and Malling Borough Council's planning register.
Decided by Tonbridge and Malling Borough CouncilCouncil page
Around Dunk's Green
Postcode districts
TN11 324 applications in the last 12 monthsTN15 582 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Tonbridge and Malling Borough Council
For home projects and trades
- Architects in Dunk's GreenFor planning applications, extensions and new builds.
- Building contractors in Dunk's GreenLocal builders for approved plans and permitted development.
Builders and trades: get new Dunk's Green jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Dunk's Green
Dunk's Green is a settlement located in Kent, England.
There are currently no active flood warnings for the Dunk's Green area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Dunk's Green a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Dunk's Green has 21 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Dunk's Green planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Dunk's Green, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 58 planning applications were submitted near Dunk's Green. Of these, 87% were approved, with an average decision time of 67 days.
The most common types were outline applications (18), full planning applications (15), tree works (10).
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).