Search Deadwater planning applications
26 applications received or decided in the last 90 days · within 1 km of the centre of Deadwater · updated daily · East Hampshire District Council
- OPEN SPACE SOUTH OF, 30 York Close, Whitehill, Bordon, HampshireAwaiting decisionOak - Cut back to the boundary line. cut low level limbs and remove any dead wood.Received week of 2 Nov 2026EHDC-26-0594-TPO
- Rear Of, 37 Hollybrook Park, Bordon, Hampshire, GU35 0DLAwaiting decisionChange of use from Welfare facilities and office accommodation to domestic dwellingReceived week of 2 Nov 2026EHDC-26-1141-FUL
- LAND NORTH AND EAST OF BROOK LODGE Bowcott Hill, Headley, Bordon, HampshireAwaiting decisionVariation of condition 2 of 57382/001 - to allow substitution of approved plansRemoval/Variation of ConditionReceived week of 26 Oct 2026EHDC-26-1203-CONVR
- 36 Branson Road, Bordon, Hampshire, GU35 0EHAwaiting decisionDemolition of existing outhouse and replacement with new twin bedroom, lobby and wet room to the side and rear of propertyHouseholderReceived week of 19 Oct 2026EHDC-26-1193-HSE
- LAND AT AND ADJOINING BORDON GARRISON Camp Road, Bordon, HampshireAwaiting decisionNon-Material Amendments sought of approved application 55587/096 Alterations to hard and soft landscaping scheme including removal of timber posts, brick piers and railings together with erection of additional bollardsNon Material AmendmentsReceived week of 19 Oct 2026EHDC-26-1175-NMA
Planning in Deadwater
- Approved
- 95%
- 18 of 18 decided
- Decision time
- about 11 weeks
- on average
Applications within 1 km of the centre of Deadwater in the last 24 months, from East Hampshire District Council's planning register.
Decided by East Hampshire District CouncilCouncil page
Around Deadwater
Postcode districts
GU35 167 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: East Hampshire District Council
For home projects and trades
- Architects in DeadwaterFor planning applications, extensions and new builds.
- Building contractors in DeadwaterLocal builders for approved plans and permitted development.
Builders and trades: get new Deadwater jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Deadwater
Deadwater is a quaint village located in the East Hampshire district of England, just 1.3 miles east of the town of Bordon and adjacent to the village of Hollywater. The nearest railway station is Liphook, situated approximately 4.1 miles to the southeast, making it a relatively accessible location for planning applications and developments in the area. It sits within the Lindford district.
There are currently no active flood warnings for the Deadwater area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Deadwater a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Deadwater has 7 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Deadwater planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Deadwater, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 85 planning applications were submitted near Deadwater. Of these, 95% were approved, with an average decision time of 75 days.
The most common types were full planning applications (14), discharge of conditions (12), tree works (11). 3 large-scale developments were submitted during this period.
2 planning appeals were lodged, of which 0 were allowed and 2 were dismissed (0% success rate).