Search Dalwood planning applications
11 applications on record · within 1 km of the centre of Dalwood · updated daily · East Devon District Council
Only 4 applications in the last 90 days, so this shows every one we hold.
- Lower Corry Farm Dalwood Axminster EX13 7HJAwaiting decisionDischarge of condition for 24/1032/LBC: Condition 3 (Materials)Received 7 Oct 202626/2041/DOC
- Lower Corry Farm Dalwood Axminster EX13 7HJApprovedT1, Ash: fell - crown shows some signs of ash dieback. The stem has a significant area of decay caused by a previously rubbing stem, there is clear rot and 30% of the circumference is damaged.Received 22 Sep 202626/1914/TRE
- Eastons Dalwood Axminster EX13 7ENAwaiting decisionDischarge of condition for 26/1166/LBC: Condition 3 (Materials) 8 x A3 drawings detailing the works to the utility room roof Manufacturers details of the proposed shower room ventDischarge of ConditionReceived 24 Aug 202626/1709/DOC
- Eastons Dalwood Axminster EX13 7ENApprovedDischarge of conditions for 26/1166/LBC : Condition 3 (materials)Received 13 Aug 2026Decided 9 Sep 202626/1642/DOC
- Eastons Dalwood EX13 7ENApprovedRaise the central chimney stack and the south east chimney stack with 700mm traditional clay pots and courses of matching brickwork to achieve 1800mm height above the thatch; line the flues of these chimneys and fit new woodburners to replace existing; relocate the oil tank to the south; fit ASHP beneath the west elevation kitchen window and upgrade the existing wet radiator heating system; replace door on west elevation with a traditionally detailed, ledge door, to be painted and fitted with an upper glazed panel; provide a shower room with WC in the modern utility room, including provision of insulation in the roof and a humidistat extraction ventilator in the modern utility room window; remove existing greenhouse and replace with re-sited greenhouseReceived 12 Jun 202626/1166/LBC
Planning in Dalwood
- Approved
- 100%
- 11 of 11 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Dalwood in the last 24 months, from East Devon District Council's planning register.
Decided by East Devon District CouncilCouncil page
Around Dalwood
Postcode districts
EX13 157 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: East Devon District Council
For home projects and trades
- Architects in DalwoodFor planning applications, extensions and new builds.
- Building contractors in DalwoodLocal builders for approved plans and permitted development.
Builders and trades: get new Dalwood jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Dalwood
Dalwood is a picturesque village in the East Devon district, located about 3 miles from Axminster and 5 miles from Honiton. Nestled within the Blackdown Hills Area of Outstanding Natural Beauty, it offers a tranquil setting that may be attractive for new planning applications. Accessible via the A35 road, Dalwood was historically linked to Dorset until 1842, which may be relevant for those researching local planning history and regulations. The settlement has a population of approximately 441 (2021 estimate). It sits within the East Devon district.
Dalwood covers an area of approximately 710.9 km². The surrounding landscape and character of the area play an important role in how planning applications are assessed by the local authority.
There are currently no active flood warnings for the Dalwood area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Dalwood a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Dalwood has 3 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Dalwood planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Dalwood, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 14 planning applications were submitted near Dalwood. Of these, 100% were approved, with an average decision time of 54 days.
The most common types were tree works (2), full planning applications (1), listed building and heritage (1).