Search Cwmdare planning applications
10 applications received or decided in the last 90 days · within 1 km of the centre of Cwmdare · updated daily · Rhondda Cynon Taf County Borough Council
- 80 Heol Keir Hardie Pen-y-waun Aberdare Rhondda Cynon Taf CF44 9ALAwaiting decisionProposed single-storey side extension, together with rear alterations comprising the demolition of the existing rear outbuilding, the blocking up of an existing rear door, and the installation of rear double patio doors.Received 26 Oct 202626/0836/FUL
- 40 Hillside Cwmdare Aberdare Rhondda Cynon Taf CF44 8RNAwaiting decisionProposed single storey extension to the side and front elevations.Received 8 Oct 202626/0881/FUL
- 7 The Rise Cwmdare Aberdare Rhondda Cynon Taf CF44 8BJAwaiting decisionUse of an existing residential dwelling for childminding purposes in addition to its residential use (Use Class D1), accommodating up to 12 children.Received 8 Oct 202626/0849/FUL
- 48 Potters Field Trecynon Aberdare Rhondda Cynon Taf CF44 8HXAwaiting decisionRetrospective planning permission is sought for the retention of a rear dormer loft extension, together with the retention of a boundary fence measuring approximately 2m to 2.2m in height.Full ApplicationReceived 21 Sep 202626/0823/FUL
- Farmhouse Nant Melyn Farm Queen Street Cwmdare Aberdare Rhondda Cynon Taf CF44 8TSAwaiting decisionThe upgrading works to the existing telecommunications mast located at the above locationReceived 15 Sep 202626/0801/TEL
Planning in Cwmdare
- Approved
- 100%
- 14 of 14 decided
- Decision time
- about 11 weeks
- on average
Applications within 1 km of the centre of Cwmdare in the last 24 months, from Rhondda Cynon Taf County Borough Council's planning register.
Decided by Rhondda Cynon Taf County Borough CouncilCouncil page
Around Cwmdare
Postcode districts
CF44 119 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Rhondda Cynon Taf County Borough Council
For home projects and trades
- Architects in CwmdareFor planning applications, extensions and new builds.
- Building contractors in CwmdareLocal builders for approved plans and permitted development.
Builders and trades: get new Cwmdare jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Cwmdare
Cwmdare, located near Aberdare in Rhondda Cynon Taf, Wales, has a rich history linked to coal mining. Following the industry's decline in the 1980s, the village has transformed into a key commuter hub for nearby towns such as Aberdare, Merthyr Tydfil, and Pontypridd, as well as the cities of Cardiff and Swansea. This shift presents opportunities for planning applications aimed at accommodating the growing residential and commercial needs of its commuter population.
There are currently no active flood warnings for the Cwmdare area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Cwmdare a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Cwmdare planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Cwmdare, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 22 planning applications were submitted near Cwmdare. Of these, 100% were approved, with an average decision time of 80 days.
The most common types were full planning applications (7), discharge of conditions (3), outline applications (1).