Search Cwm-Fields planning applications
19 applications received or decided in the last 90 days · within 1 km of the centre of Cwm-Fields · updated daily · Torfaen County Borough Council
- Ground Floor 2A Commercial Street Pontypool Torfaen NP4 6JJAwaiting decisionDOC 4 (CEMP) and 6 (External Storage waste/refuse and Bikes) of planning application 24/P/0735/FUL - Retention of A1 use to the ground floor, and alterations & repairs to form 5 self-contained flats on the first and second floorsReceived 4 Nov 202626/P/0484/CND
- Flat 1 High Street Pontypool Torfaen NP4 6EYAwaiting decisionDOC 4 - Revised drainage statement of planning application 26/P/0379/FUL - Replacement of flat roof with new mono pitched lightweight metal roofReceived 4 Nov 202626/P/0513/CND
- Ty Glyn Albion Road Pontypool Torfaen NP4 6GEAwaiting decisionDischarge of condition 4 (Method Statement and Risk Assessment) relating to planning permission 26/P/0290/FUL to form new Multi Use Games Area with new surface and fencing to existing play yard area.Received 19 Oct 202626/P/0493/CND
- Lloyds Tsb Bank Plc Commercial Street Pontypool Torfaen NP4 6YEAwaiting decisionVariation of condition 2 (biodiversity enhancement) of application 26/P/0210/VAR for the conversion of former bank to six flats, retention of partial A2 use on ground floor and basement and associated worksReceived 15 Oct 202626/P/0483/VAR
- Ground Floor 2 Commercial Street Pontypool Torfaen NP4 6JJAwaiting decisionDOC Conditions 3 (Specification of Works), 4 (Details of proposed insulated dry lining systems), 5 (a full schedule and large-scale details for the repair or replacement of vertical sliding sash windows fronting Commercial Street or Crane Street), 6 (Details of all proposed new rear windows and any exterior doors), 7 (schedule for the redecoration of external joinery, shopfront and masonry (colours and paint specification) and 8 Details of any secondary glazing shall be submitted to and approved) for planning application 24/P/0736/LBC.Received 15 Oct 202626/P/0498/CND
Planning in Cwm-Fields
- Approved
- 84%
- 57 of 60 decided
- Decision time
- about 12 weeks
- on average
Applications within 1 km of the centre of Cwm-Fields in the last 24 months, from Torfaen County Borough Council's planning register.
Decided by Torfaen County Borough CouncilCouncil page
Around Cwm-Fields
Postcode districts
NP4 186 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Torfaen County Borough Council
For home projects and trades
- Architects in Cwm-FieldsFor planning applications, extensions and new builds.
- Building contractors in Cwm-FieldsLocal builders for approved plans and permitted development.
Builders and trades: get new Cwm-Fields jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Cwm-Fields
Cwm-Fields is a settlement located in Torfaen, Wales.
There are currently no active flood warnings for the Cwm-Fields area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Cwm-Fields a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Cwm-Fields planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Cwm-Fields, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 81 planning applications were submitted near Cwm-Fields. Of these, 84% were approved, with an average decision time of 87 days.
The most common types were full planning applications (41), discharge of conditions (13), listed building and heritage (4).