Search Croughton planning applications
19 applications on record · within 1 km of the centre of Croughton · updated daily · West Northamptonshire Council
Only 3 applications in the last 90 days, so this shows every one we hold.
- 20 Portway Drive Croughton NN13 5NAAwaiting decisionFirst floor extension above an existing ground floor garage conversion, replace a front window and a rear window with a window and door set.Householder Planning PermissionReceived 23 Oct 20262026/3832/HH
- The Old Rectory 5 High Street Croughton NN13 5LTAwaiting decisionT1 Ash Reduce lateral spread all round by approximately 2.5m to relieve end weight on heavy structural limbs. T2 Magnolia Reduce by 2m T3 Lime Crown reduction by 4m in height and 2m on lateral spread. T4 Lime Fell over mature tree with Ganoderma all round base, major die backWorks to Trees (Conservation Area)Received 5 Oct 20262026/3963/TCA
- The Willows 5B Wheelers Rise Croughton NN13 5NDApprovedCertificate of Lawfulness for Proposed Development comprising of Single storey rear extensionLawful Development Certificate (Proposed)Received 3 Sep 2026Decided 23 Oct 20262026/3550/LDP
- Holly Tree Cottage 25 Park End Croughton NN13 5LXApprovedSingle storey rear extension (kitchen/utility) with extended gable end to first floor bedroom. Open porch structure above/adjacent to front entrance doorFull Planning PermissionReceived 2 Feb 2026Decided 2 Apr 20262026/0560/FULL
- Peartree House 4 Portway Croughton NN13 5LYApprovedSingle storey front extensionFull Planning PermissionReceived 15 Dec 2025Decided 20 May 20262025/5297/FULL
Planning in Croughton
- Approved
- 90%
- 9 of 10 decided
- Decision time
- about 18 weeks
- on average
Applications within 1 km of the centre of Croughton in the last 24 months, from West Northamptonshire Council's planning register.
Decided by West Northamptonshire CouncilCouncil page
Around Croughton
Postcode districts
NN13 143 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: West Northamptonshire Council
For home projects and trades
- Architects in CroughtonFor planning applications, extensions and new builds.
- Building contractors in CroughtonLocal builders for approved plans and permitted development.
Builders and trades: get new Croughton jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Croughton
Croughton is a quaint village and civil parish located in West Northamptonshire, England, approximately 3 miles southwest of Brackley. With a population of 992 recorded in the 2011 census, it offers a close-knit community atmosphere that may influence local planning applications and development opportunities in the area. The settlement has a population of approximately 1,200 (2021 estimate). It sits within the West Northamptonshire district.
Croughton covers an area of approximately 873.2 km². The surrounding landscape and character of the area play an important role in how planning applications are assessed by the local authority.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Croughton a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Croughton planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Croughton, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 12 planning applications were submitted near Croughton. Of these, 90% were approved, with an average decision time of 128 days.
The most common types were full planning applications (7), outline applications (1), amendments (1).