Search Cowlands planning applications
19 applications received or decided in the last 12 months · within 1 km of the centre of Cowlands · updated daily · Cornwall Council
Only 7 applications in the last 90 days, so this shows the last 12 months.
- Land Adjacent Treloggas Barn Old Kea Truro Cornwall TR3 6AXAwaiting decisionProposed restoration and conversion of existing barn to form a dwelling, new garage/log store with Variation of Condition 1 in respect of Decision Notice PA26/03899 dated 29th July 2026 and Variation of Condition 2 of Decision Notice PA17/02308 (full planning).Received 28 Oct 2026PA26/06591
- Treloggas Garden Old Kea Truro Cornwall TR3 6AXAwaiting decisionInstallation of a ground-mounted solar photovoltaic array (24 panels on four frames, maximum height 2.1 m) within the residential curtilage, and removal of four existing ground-mounted solar panels.Received 19 Oct 2026PA26/07262
- Derow 4 Kelliwith Feock Truro Cornwall TR3 6QZAwaiting decisionWorks to trees subject to a Tree Preservation Order(TPO) T16 & G17(A) Oaks reduce crowns, G17(2/4) - Oaks. Fell completely ,G17(7) - Oak branch removed.Received 17 Sep 2026PA26/06348
- Grosse Point Mount George Road Penelewey Feock Truro Cornwall TR3 6QXAwaiting decisionConstruction of Outdoor Swimming Pool, Single Storey Incidental Building & Associated WorksReceived 8 Sep 2026PA26/06183
- Woodbine Cottage Penelewey Feock Cornwall TR3 6QYAwaiting decisionAlterations to existing dwelling and construction of new dwelling and associated works within garden areaReceived 20 Aug 2026PA26/05666
Planning in Cowlands
- Approved
- 76%
- 16 of 17 decided
- Decision time
- about 7 weeks
- on average
Applications within 1 km of the centre of Cowlands in the last 24 months, from Cornwall Council's planning register.
Decided by Cornwall CouncilCouncil page
Around Cowlands
Postcode districts
TR3 297 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Cornwall Council
For home projects and trades
- Architects in CowlandsFor planning applications, extensions and new builds.
- Building contractors in CowlandsLocal builders for approved plans and permitted development.
Builders and trades: get new Cowlands jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Cowlands
Cowlands is a quaint hamlet located at the head of Coombe Creek, southeast of Playing Place in Cornwall, England. As part of the civil parish of Truro, Cowlands had its population included in the 2011 Census, making it an area of interest for planning applications and local development in the region.
There are currently no active flood warnings for the Cowlands area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Cowlands a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Cowlands has 7 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Cowlands planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Cowlands, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 33 planning applications were submitted near Cowlands. Of these, 76% were approved, with an average decision time of 52 days.
The most common types were tree works (9), listed building and heritage (4), full planning applications (3).