Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

Coombelake, Devon Planning Applications

Recent planning applications near Coombelake, Devon.

Devon · England · settlement

Planning applications in Coombelake are administered by East Devon District Council. View the full East Devon District Council planning applications page for approval rates and decision timelines.

Enter a postcode to search for planning applications near Coombelake.

Town Insights

Property Prices

Area Information

  • Admin district: East Devon
  • Parliamentary constituency: Honiton and Sidmouth
  • LSOA: East Devon 008D

Crime Statistics

0 crimes reported in 2026-02.

Flood Risk

No active flood warnings near Coombelake.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near Coombelake.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for Coombelake based on the last 24 months of planning data.

Nearby Applications

5 planning applications found near Coombelake.

  1. 26/0955/FUL - Cadhay Barton Cadhay Ottery St Mary EX11 1QY
    Partial demolition and extension of existing boot room, replacement of existing pitched roof with flat roof, conversion of existing garage, installation of new doors and windows including French doors
    Status: Undecided | Council: East Devon | Date: 2026-05-14
  2. - 4 Coombelake Cottages Coombelake Ottery St Mary EX11 1NG
    Minor amendment for 25/2426/FUL : To move the spiral staircase to the right (south) by approximately 1.2m
    Status: Undecided | Type: Amendment | Council: East Devon | Date: 2026-03-16
    View full details
  3. - 4 Coombelake Cottages Coombelake Ottery St Mary EX11 1NG
    Roof terrace on existing single storey flat roofed extension (part retrospective).
    Status: Undecided | Type: Full | Council: East Devon | Date: 2025-12-02
    View full details
  4. - Cadhay Barton Cadhay Ottery St Mary Devon EX11 1QY
    Erection of ground fixed solar panels within the curtilage of an existing C3 dwelling
    Status: Conditions | Type: Full | Council: East Devon | Date: 2025-08-19
    View full details
  5. - Cooinda Coombelake Devon EX11 1NG
    Construction of rear and side extensions, 3 no. front dormer windows, raising of roof, balcony and detached garage with office space above (resubmission of 20/2273/FUL)
    Status: Conditions | Type: Full | Council: East Devon | Date: 2024-07-15
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of Coombelake in Devon

Coombelake is a settlement located in Devon, England.

There were no crimes reported in the immediate area during the most recent reporting period. This makes Coombelake a particularly low-crime area.

Coombelake has one conservation area within its boundaries: Ottery St Mary. Planning applications within or near this conservation area are subject to additional scrutiny to preserve the architectural and historic character of the area. Homeowners and developers should be aware that permitted development rights may be restricted.

Ecology & Nature Designations

The area around Coombelake includes 4 Ancient Woodland sites. These designations may affect planning decisions, as proposals near protected sites require environmental impact assessment and may face additional restrictions.

For anyone interested in property development or monitoring local planning decisions, Coombelake planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in Coombelake

In the last 24 months, 11 planning applications were submitted near Coombelake. The average decision time was 42 days.

The average decision time of 42 days is within the government's 8-week statutory target for minor applications, indicating an efficient planning department.

The most common application types near Coombelake were full planning applications (4), listed building and heritage (2), tree works (1). Full planning applications account for 36% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.

Nearby Towns

Explore planning applications in nearby areas:

  • Taleford planning applications
  • Fairmile planning applications
  • Gosford planning applications
  • Woodford planning applications
  • Ottery St Mary planning applications
  • Larkbeare planning applications
  • West Hill planning applications
  • Aller Grove planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account