Search Compton planning applications
17 applications received or decided in the last 90 days · within 1 km of the centre of Compton · updated daily · Wolverhampton City Council
- 32 Uplands Avenue Merry Hill Wolverhampton West Midlands WV3 8AAAwaiting decisionKitchen and sitting room extension with bedroom and ensuite aboveReceived 5 Nov 202626/01194/FUL
- 10 Maythorn Gardens Wolverhampton West Midlands WV6 8NPAwaiting decisionSingle storey rear extension with external stairs and balcony aboveReceived 4 Nov 202626/01209/FUL
- Washington Cottage Finchfield Gardens Wolverhampton West Midlands WV3 9LTAwaiting decisionT1 - Lime Reduce back to previous pruning points/knuckles. This tree has been managed historically on a cyclical basis T2 - Lime Reduce back to previous pruning points/knuckles. This tree has been managed historically on a cyclical basis T3 - Lime Reduce back to previous pruning points/knuckles. This tree has been managed historically on a cyclical basis T4 - Lime Reduction of no more than 2m This tree has been missed as part of the pollarding cycle. The lime tree sits alongside three other limes T1,2 &3 (and a pear) that are managed as an established pollard line or group. Leaving one unmanaged tree disrupts the uniform appearance, balance, and visual symmetry of the feature. To establish visual continuity and structural uniformity within an existing group of historically managed trees. Bringing this final lime into harmony with the adjacent three pollarded limes will enhance the overall amenity and cohesive appearance of the garden boundary/feature. Initiating a managed pollard regime at this stage in the tree's development ensures future containment, preventing the tree from outgrowing its spatial constraints and reducing the likelihood of heavy, unmanaged interventions later in its maturity. This work can then take place gradually over the next 2-3 years T5 - Pear Reduce back to previous pruning points/knuckles. This tree has been managed historically on a cyclical basisReceived 23 Oct 202626/01141/TR
- 13 Westfield Grove Wolverhampton West Midlands WV3 8EXAwaiting decisionSingle storey side extension and new pitched roof over existing single storey side extension.Received 8 Oct 202626/01070/FUL
- Wolverhampton Wanderers Academy Compton Park Wolverhampton West Midlands WV3 9DUAwaiting decisionRetrospective application for the installation of twelve single modular buildings for use as changing room facilities for a temporary period of 52 weeks.Received 30 Sep 202626/01028/FUL
Planning in Compton
- Approved
- 80%
- 12 of 14 decided
- Decision time
- about 6 weeks
- on average
Applications within 1 km of the centre of Compton in the last 24 months, from Wolverhampton City Council's planning register.
Decided by Wolverhampton City CouncilCouncil page
Around Compton
Postcode districts
WV3 170 applications in the last 12 monthsWV6 307 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Wolverhampton City Council
For home projects and trades
- Architects in ComptonFor planning applications, extensions and new builds.
- Building contractors in ComptonLocal builders for approved plans and permitted development.
Builders and trades: get new Compton jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Compton
Compton is a suburban area located to the west of Wolverhampton city centre in the West Midlands, England. Situated along the A454, it falls within the Tettenhall Wightwick ward, making it a key area for potential planning applications and developments in the region.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Compton a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Compton has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Compton planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Compton, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 93 planning applications were submitted near Compton. Of these, 80% were approved, with an average decision time of 44 days.
The most common types were tree works (20), full planning applications (5), outline applications (2).