Search Carrington planning applications
11 applications received or decided in the last 12 months · within 1 km of the centre of Carrington · updated daily · Trafford Metropolitan Borough Council
Only 3 applications in the last 90 days, so this shows the last 12 months.
- Manchester United Football Club Isherwood Road Carrington Manchester M31 4BHAwaiting decisionApplication for the replacement of natural pitch with synthetic surface (pitch 12) and installation of a total of 8no. column mounted floodlights to pitches 12, 13 and 14 and associated works.Received 30 Sep 2026120096/FUL/26
- Land Off Manchester Road CarringtonAwaiting decisionApplication for approval of details reserved by conditions of grant of planning permission 113151/RES/24. Condition number: 12 (CEMP)Received 11 Sep 2026119962/CND/26
- Phase R6/7 Carrington Village CarringtonApprovedApplication for approval of details reserved by conditions of grant of planning permission 99245/OUT/19. Partial Discharge of Condition numbers: 10 (Existing and Finished Site Levels), 29 (Surface Water Drainage Infiltration Design), 32 (Mitigation Impacts of Flood Risk), 34 (Sustainable Drainage Scheme), 36 (Site Wide Sustainable Foul and Surface Water Drainage Scheme) and 37 (Foul Drainage Scheme) in relation to Phase R6/7 only.Discharge ConditionReceived 3 Aug 2026Decided 23 Oct 2026119691/CND/26
- Land Known As Carrington Village On Land Off Manchester Road, CarringtonAwaiting decisionApplication for approval of details reserved by conditions of grant of planning permission 99245/OUT/19. Part discharge of Condition number: 26 (Remediation Strategy to Avoid Harm to Controlled Waters) Phase R4 only.Discharge ConditionReceived 15 Jun 2026119366/CND/26
- Land Adjacent To Carrington Training Centre Carrington Manchester M31 4BHAwaiting decisionRetention of a surface car park for a temporary period of three years up to 03 June 2029Received 9 Jun 2026119265/FUL/26
Planning in Carrington
Only 6 decisions near Carrington in the last 2 years, too few to judge an approval rate.
Applications within 1 km of the centre of Carrington in the last 24 months, from Trafford Metropolitan Borough Council's planning register.
Decided by Trafford Metropolitan Borough CouncilCouncil page
Around Carrington
Postcode districts
M31 64 applications in the last 12 monthsM41 314 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Trafford Metropolitan Borough Council
For home projects and trades
- Architects in CarringtonFor planning applications, extensions and new builds.
- Building contractors in CarringtonLocal builders for approved plans and permitted development.
Builders and trades: get new Carrington jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Carrington
Carrington is a village and civil parish located in the Metropolitan Borough of Trafford, Greater Manchester. Once part of Cheshire, it lies to the west of the Greater Manchester Urban Area and features a mix of residential areas and several industrial sites, making it a notable location for planning applications related to both development and infrastructure. The settlement has a population of approximately 480 (2021 estimate). It sits within the Trafford district.
For anyone interested in property development or monitoring local planning decisions, Carrington planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Carrington, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 12 planning applications were submitted near Carrington.
The most common types were discharge of conditions (5), amendments (2), full planning applications (1).