Search Carlton planning applications
11 applications received or decided in the last 12 months · within 1 km of the centre of Carlton · updated daily · Stockton-on-Tees Borough Council
Only 2 applications in the last 90 days, so this shows the last 12 months.
- Battery Energy Storage System Letch Lane CarltonApprovedInformation to discharge condition No.9 (Biodiversity Management Plan) and No.11 (Construction Environmental Management Plan) of planning permission 23/1945/FUL - Siting of a battery storage facility, underground cable connection, ancillary equipment, fencing and associated landscaping and upgrade to existing access point.Received 17 Aug 202626/1578/DCH
- 11 Willow Bridge Close Carlton Stockton-On-Tees TS21 1BFApprovedInstallation of 6no Solar Photovoltaics (PV) panels to the side.Received 15 Jul 202626/1337/FUL
- Redmarshall House Drovers Lane Redmarshall Stockton-On-Tees TS21 1ELApprovedErection of 2m high boundary fence to the front/sideFull ApplicationReceived 8 Jul 2026Decided 3 Sep 202626/1342/FUL
- Land South Of Gately Moor Reservoir Near Redmarshall Stockton-On-TeesApprovedInformation to discharge condition no13 (Contaminated Land) of planning approval 22/1499/FUL - Proposed solar farm (49.99mw) and energy storage together with all associated works, equipment and infrastructureDischarge ConditionsReceived 19 May 2026Decided 8 Jun 202626/0973/DCH
- Land Adjacent To Woodleigh Letch Lane CarltonApprovedNotice under regulation 5 of electronic communications code regulations for the installation of 1no 10 metre medium wooden pole.Received 14 May 202626/0947/TNOT
Planning in Carlton
- Approved
- 100%
- 12 of 12 decided
- Decision time
- about 6 weeks
- on average
Applications within 1 km of the centre of Carlton in the last 24 months, from Stockton-on-Tees Borough Council's planning register.
Decided by Stockton-on-Tees Borough CouncilCouncil page
Around Carlton
Postcode districts
TS21 146 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Stockton-on-Tees Borough Council
For home projects and trades
- Architects in CarltonFor planning applications, extensions and new builds.
- Building contractors in CarltonLocal builders for approved plans and permitted development.
Builders and trades: get new Carlton jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Carlton
Carlton is a village and civil parish located in the borough of Stockton-on-Tees within County Durham, England. With a population of 726 as recorded in the 2011 census, it lies just a few miles north-west of Stockton-on-Tees and near the village of Redmarshall, making it a notable area for potential planning applications and development opportunities. The settlement has a population of approximately 825 (2021 estimate). It sits within the Stockton-on-Tees district.
There are currently no active flood warnings for the Carlton area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Carlton a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Carlton has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Carlton planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Carlton, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 13 planning applications were submitted near Carlton. Of these, 100% were approved, with an average decision time of 41 days.
The most common types were discharge of conditions (3), full planning applications (2), outline applications (1).
2 planning appeals were lodged, of which 0 were allowed and 2 were dismissed (0% success rate).