Calow, Derbyshire Planning Applications
Track planning applications in and around Calow, Derbyshire — decisions, approval rates, and new developments, with instant alerts.
14 applications on record near Calow
Get started freePlanning activity in Calow
- 14 applications on record
- 75% approval rate (3 permitted, 1 refused)
- Typical decision time: 41 days
- 10 currently undecided
Most common types: Full (6), Outline (5), Conditions (2), Amendment (1).
Recent applications near Calow
- NorthEastDerbyshire/24/00437/FLH1 Freydon Way Calow Chesterfield S44 5TRPermitted
- NorthEastDerbyshire/26/00085/AMENDLand From The East Of Dark Lane To The West Of Oaks Farm Lane CalowPermitted
- NorthEastDerbyshire/24/00560/DISCONLand From The East Of Dark Lane To The West Of Oaks Farm Lane CalowConditions
- NorthEastDerbyshire/24/00994/DISCON56 Top Road Calow Chesterfield S44 5SYUndecided
- NorthEastDerbyshire/26/00206/MFLLand South And East Of 14 To 16 Dark Lane CalowUndecided
- Chesterfield/CHE/23/00272/DOC40 Westmoor Road Brimington Derbyshire S43 1PTConditions
- Chesterfield/CHE/26/00493/OUTLand To The South Of Bamford Road Inkersall Chesterfield DerbyshireUndecided
- Chesterfield/CHE/25/00439/HOU5 Westwood Drive Inkersall Chesterfield Derbyshire S43 3DFRejected
- Chesterfield/CHE/26/00167/OUTLand Adjacent To 28 Castleton Grove Inkersall Chesterfield DerbyshireUndecided
- Chesterfield/CHE/23/00331/NMAOldfield Farm Wetlands Lane Brimington Chesterfield Derbyshire S43 1QGRejected
- Chesterfield/CHE/26/00216/VCONOldfield Farm Wetlands Lane Brimington Chesterfield Derbyshire S43 1QGUndecided
- Chesterfield/CHE/25/00194/FULPlover Hill Farm, Farm House View Wetlands Lane Brimington Chesterfield Derbyshire S43 1QGConditions
Nearby towns
Frequently asked questions
How many planning applications have been submitted near Calow?
In the last 24 months, 14 planning applications were submitted near Calow. The approval rate is 75%.
How long do planning decisions take near Calow?
The average planning decision time near Calow is 41 days. The statutory target is 8 weeks (56 days) for minor applications and 13 weeks for major applications.
What is the planning approval rate near Calow?
The planning approval rate near Calow is 75%. The national average across England and Wales is approximately 87%.
What types of planning applications are most common near Calow?
The most common type of planning application near Calow is full planning applications, with 6 submissions in the last 24 months.
How can I track planning applications near Calow?
You can search and track planning applications near Calow on Planning Signal. Create a free account to save searches, watch specific applications, and receive email alerts when new plans are submitted nearby.