Search Burghwallis planning applications
123 applications on record · within 1 km of the centre of Burghwallis · updated daily · Doncaster Metropolitan Borough Council
Only 2 applications in the last 90 days, so this shows every one we hold.
- Deer Park Lodge Grange Lane Burghwallis Doncaster DN6 9JLAwaiting decisionErection of 1no 3 bedroom detached dwelling house following the demolition of agricultural buildingReceived 25 Aug 202626/01595/FUL
- Outside Of Rose Cottage Old Village Street Burghwallis Doncaster DN6 9JNApprovedThe electronic communications code (conditions and restrictions) regulations 2003 (as amended) regulation 5 notice of intention to install fixed line broadband apparatus - Installation of 1no 11m light poleReceived 11 Aug 2026Decided 13 Aug 202626/01534/PDTEL
- 15A Grange Lane Burghwallis Doncaster DN6 9JRAwaiting decisionErection of a two storey side extension, following the demolition of the existing attached garage.Received 15 Jun 202626/01043/FUL
- The Elms 15 Grange Lane Burghwallis Doncaster DN6 9JRAwaiting decisionErection of a first floor dormer extension over the existing garage, erection of a single storey rear extension, following the demolition of the existing rear single storey extension and chimney.Received 28 Apr 202626/00792/FUL
- Dower House The Abbes Walk Burghwallis Doncaster DN6 9JHAwaiting decisionTo remove a dangerous treeReceived 30 Mar 202626/00628/5DAY
Planning in Burghwallis
- Approved
- 82%
- 9 of 10 decided
- Decision time
- about 10 weeks
- on average
Applications within 1 km of the centre of Burghwallis in the last 24 months, from Doncaster Metropolitan Borough Council's planning register.
Decided by Doncaster Metropolitan Borough CouncilCouncil page
Around Burghwallis
Postcode districts
DN6 142 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Doncaster Metropolitan Borough Council
For home projects and trades
- Architects in BurghwallisFor planning applications, extensions and new builds.
- Building contractors in BurghwallisLocal builders for approved plans and permitted development.
Builders and trades: get new Burghwallis jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Burghwallis
Burghwallis is a quaint village and civil parish located in rural South Yorkshire, England, with a population of 300 as recorded in the 2011 census. Nestled among mixed farmland and woodlands, it sits on a slight rise approximately six miles northwest of Doncaster and just one mile from the A1, making it a unique area for potential planning applications within a tranquil setting. The settlement has a population of approximately 305 (2021 estimate). It sits within the Doncaster district.
There are currently no active flood warnings for the Burghwallis area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Burghwallis a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Burghwallis planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Burghwallis, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 16 planning applications were submitted near Burghwallis. Of these, 82% were approved, with an average decision time of 69 days.
The most common types were full planning applications (4), tree works (2), telecoms (2). 1 large-scale development was submitted during this period.
2 planning appeals were lodged, of which 1 was allowed and 1 was dismissed (50% success rate).