Search Broad Oak planning applications
18 applications received or decided in the last 90 days · within 1 km of the centre of Broad Oak · updated daily · East Devon District Council
- White House West Hill Road West Hill Ottery St Mary EX11 1UZAwaiting decisionT4, Beech : old grown out hedge. Reduce back to hedge height at maintain at that height (1.5 to 2m)Received 3 Nov 202626/2237/TRE
- The Leys Higher Broad Oak Road West Hill Devon EX11 1XJAwaiting decisionBeech : crown lift of drooping growth up to 4m, maximum diameter of cuts (MDC) 60mm. Selective reduction of the lateral crown around the circumference of the tree by up to 2m, MDC 120mm.Received 2 Nov 202626/2131/TRE
- 20 Eastfield West Hill Ottery St Mary EX11 1XNAwaiting decisionT6, Oak : crown reduce height, southern and eastern aspects by 5m, maximum diameter of cuts (MDC) 150mm (4 tonne dynamic brace to be installed as well); remove deadwood T7, Oak, : crown reduce by up to 3m, MDC 75-100mm. Remove deadwood. T8, Western Red Cedar : reduce southern aspect by 3m, MDC - 1 @75mm remaining cuts no bigger than 50mm.Felling/Lopping (TPO)Received 30 Oct 202626/2217/TRE
- 7 Birch Grove West Hill Ottery St Mary EX11 1XPAwaiting decisionT004, Beech : dismantle to 2.5-3m in height and retain as a monolith.Felling/Lopping (TPO)Received 22 Oct 202626/2156/TRE
- Land West OF Hayes End West Hill EX11 1GGAwaiting decisionModification of affordable housing provisions to enable provision of off-site financial contribution in lieu of provision of 4no affordable dwellingsReceived 2 Oct 202626/1995/V106
Planning in Broad Oak
- Approved
- 76%
- 44 of 48 decided
- Decision time
- about 9 weeks
- on average
Applications within 1 km of the centre of Broad Oak in the last 24 months, from East Devon District Council's planning register.
Decided by East Devon District CouncilCouncil page
Around Broad Oak
Postcode districts
EX11 128 applications in the last 12 monthsEX5 321 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: East Devon District Council
For home projects and trades
- Architects in Broad OakFor planning applications, extensions and new builds.
- Building contractors in Broad OakLocal builders for approved plans and permitted development.
Builders and trades: get new Broad Oak jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Broad Oak
Broad Oak is a settlement located in Devon, England.
There are currently no active flood warnings for the Broad Oak area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Broad Oak a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Broad Oak has 10 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Broad Oak planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Broad Oak, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 94 planning applications were submitted near Broad Oak. Of these, 76% were approved, with an average decision time of 64 days.
The most common types were tree works (34), discharge of conditions (16), full planning applications (11).
2 planning appeals were lodged, of which 1 was allowed and 1 was dismissed (50% success rate).