Search Bradpole planning applications
10 applications received or decided in the last 90 days · within 1 km of the centre of Bradpole · updated daily · Dorset Council
- St James Park Nursing Home Higher Street Bridport DT6 3EUAwaiting decisionT1 Monterey Cypress - Reduce low laterals by 2.5mTree Works- TPOReceived 26 Oct 2026P/TRT/2026/05992
- 22 Hemlets Close Bridport DT6 3FBAwaiting decisionReplace the existing conservatory at the rear of the property with a single story extension.Householder Planning PermissionReceived 26 Oct 2026P/HOU/2026/05576
- St James Park Nursing Home Higher Street Bridport DT6 3EUAwaiting decisionT1 Lime - Reduce by 2.5m the overhanging branches back to boundary as neededTree Works- Conservation AreaReceived 23 Oct 2026P/TRC/2026/05952
- Slaughterhouse Mangerton Lane Bridport DT6 3SFAwaiting decisionErect extensions & alterations to existing Abattoir including associated drainage & landscaping works. Form car parking area (with variation of conditions 2, 4, 6, 10, 11, 15, 17, 21 of planning permission P/FUL/2024/04044 to reduce its scale and reverse the process flow of the proposed operations and revised wording of conditions to import approved details)Variation of ConditionReceived 28 Sep 2026P/VOC/2026/05367
- Broad Road Farm Beaminster Road Bridport DT6 3TSApprovedErect plant room, install air source heat pump and create 3No. landscaping bundsFull Planning ApplicationReceived 16 Sep 2026Decided 2 Nov 2026P/FUL/2026/04994
Planning in Bradpole
- Approved
- 90%
- 19 of 21 decided
- Decision time
- about 5 weeks
- on average
Applications within 1 km of the centre of Bradpole in the last 24 months, from Dorset Council's planning register.
Decided by Dorset CouncilCouncil page
Around Bradpole
Postcode districts
DT6 386 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Dorset Council
For home projects and trades
- Architects in BradpoleFor planning applications, extensions and new builds.
- Building contractors in BradpoleLocal builders for approved plans and permitted development.
Builders and trades: get new Bradpole jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Bradpole
Bradpole is a village located in the civil parish of Bridport, southwest Dorset, just 1 mile from the town centre of Bridport. As of the 2011 census, the parish has a population of 2,339, making it a small but growing community within the picturesque Brit valley, which may be of interest for potential planning applications in the area. The settlement has a population of approximately 2,322 (2021 estimate). It sits within the Bridport district.
There are currently no active flood warnings for the Bradpole area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Bradpole a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Bradpole has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Bradpole planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Bradpole, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 28 planning applications were submitted near Bradpole. Of these, 90% were approved, with an average decision time of 36 days.
The most common types were tree works (8), full planning applications (5), amendments (4). 1 large-scale development was submitted during this period.