Search Boys Village planning applications
18 applications received or decided in the last 12 months · within 1 km of the centre of Boys Village · updated daily · Vale of Glamorgan Council
Only 7 applications in the last 90 days, so this shows the last 12 months.
- West Farm, West Street, Llantwit MajorApprovedDischarge of Condition 5.(Timber Replacement ) for plannig ref 2025/00510/LBC - LBC for replacement of porch, roof covering, guttering and works to chimney.Condition DischargeReceived 22 Oct 2026Decided 23 Oct 20262025/00510/2/CD
- Land to the East of Aston Martin Lagonda and West of Cowbridge Road, Bro Tathan, St. Athan.Awaiting decisionDischarge of Conditions 7 (Ecological Masterplan) & 8 (LEMP) of planning permission 2023/00949/FUL. (Demolition of buildings including the removal of hazardous materials, foundations and associated utility disconnections, reprofiling of land and erection of bat house mitigation and associated landscaping at Land to the East of Aston Martin Lagonda and West of Cowbridge Road, Bro Tathan, St. Athan.)Received 7 Sep 20262023/00949/4/CD
- West Farm, West Street, Llantwit MajorAwaiting decisionEnclosure of an existing open-fronted garage bay to create a utility space and reinstatement of a window to current blocked up opening.Listed Building Consent applicationReceived 25 Aug 20262026/00600/LBC
- Gileston Cottage, GilestonApprovedWork to Tree(s) in a Conservation Area: Scots Pine (Pinus sylvestris). Heavily reduce crown from reduction points.Work to trees in a Conservation AreaReceived 6 Aug 2026Decided 29 Sep 20262026/00590/TCA
- St. Athan Boys Village, St. AthanAwaiting decisionDischarge of Conditions 9 (Engineering Details) 11 (Landscaping and Tree Protection) 14 (Levels/Sections) 16 (Drainage scheme) 19 (Means of Enclosure) & 23 (Birds) of Planning Ref 2016/00369/OUT: Demolition of part demolished, fire damaged and derelict former C1 residential buildings. Construction of 14 no. link dwellings (40% affordable), and the conversion of the existing chapel into a dwelling and the retention/extension of the caretaker's bungalowCondition DischargeReceived 20 Jul 20262016/00369/2/CD
Planning in Boys Village
- Approved
- 87%
- 13 of 13 decided
- Decision time
- about 16 weeks
- on average
Applications within 1 km of the centre of Boys Village in the last 24 months, from Vale of Glamorgan Council's planning register.
Decided by Vale of Glamorgan CouncilCouncil page
Around Boys Village
Postcode districts
CF62 96 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Vale of Glamorgan Council
For home projects and trades
- Architects in Boys VillageFor planning applications, extensions and new builds.
- Building contractors in Boys VillageLocal builders for approved plans and permitted development.
Builders and trades: get new Boys Village jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Boys Village
St Athan Boys' Village, situated in West Aberthaw within the Vale of Glamorgan, Wales, was a village-style holiday camp. This unique facility provided recreational opportunities in the area, making it a notable location for potential planning applications related to tourism and community development.
For anyone interested in property development or monitoring local planning decisions, Boys Village planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Boys Village, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 21 planning applications were submitted near Boys Village. Of these, 87% were approved, with an average decision time of 111 days.
The most common types were full planning applications (5), discharge of conditions (3), tree works (2). 1 large-scale development was submitted during this period.