Search Boxted Cross planning applications
12 applications received or decided in the last 12 months · within 1 km of the centre of Boxted Cross · updated daily · Colchester City Council
Only 4 applications in the last 90 days, so this shows the last 12 months.
- Boxted St Peters CE Primary School, Carters Hill, Boxted Colchester CO4 5YNAwaiting decisionCC/COL/73/26 - formal observations for proposed installation of air source heat pumps (ASHPs) and the installation of solar PV panels on the roofs of existing school buildingsConsultation (Inside Borough)Received 16 Oct 2026261853
- Boxted St Peters C Of E Primary School, Carters Hill, Boxted, Essex, CO4 5YNAwaiting decisionProposed installation of air source heat pumps (ASHPs) and the installation of solar PV panels on the roofs of existing school buildingsFull Planning Application CCReceived 5 Oct 2026CC/COL/73/26
- Vine House, Cooks Hill, Boxted Colchester CO4 5SSAwaiting decisionInstallation of pool, replacement gates and associated landscaping. New light fitting fixed to house.Full (8 Week Determination)Received 29 Sep 2026261735
- Vine House, Cooks Hill, Boxted Colchester CO4 5SSAwaiting decisionListed building application for installation of pool, replacement gates and associated landscaping. New light fitting fixed to house.Listed BuildingReceived 29 Sep 2026261736
- Land north of, Straight Road, Boxted ColchesterAwaiting decisionOutline planning application for up to 150 residential dwellings, surface water drainage basin, new vehicular and pedestrian access, public open space, landscaping enhancements and associated infrastructure works; all matters reserved except for accessOutline (13 Week Determination)Received 27 Jul 2026261376
Planning in Boxted Cross
- Approved
- 100%
- 10 of 10 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Boxted Cross in the last 24 months, from Colchester City Council's planning register.
Decided by Colchester City CouncilCouncil page
Around Boxted Cross
Postcode districts
CO4 109 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Colchester City Council
For home projects and trades
- Architects in Boxted CrossFor planning applications, extensions and new builds.
- Building contractors in Boxted CrossLocal builders for approved plans and permitted development.
Builders and trades: get new Boxted Cross jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Boxted Cross
Boxted Cross is a settlement located in Essex, England. It sits within the Boxted district.
There are currently no active flood warnings for the Boxted Cross area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Boxted Cross a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Boxted Cross has 5 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Boxted Cross planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Boxted Cross, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 19 planning applications were submitted near Boxted Cross. Of these, 100% were approved, with an average decision time of 53 days.
The most common types were full planning applications (5), discharge of conditions (5), outline applications (3). 1 large-scale development was submitted during this period.
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).