Search Bowdon planning applications
37 applications received or decided in the last 90 days · within 1 km of the centre of Bowdon · updated daily · Trafford Metropolitan Borough Council
- 17 Stanhope Road Bowdon Altrincham WA14 3LAAwaiting decisionDemolition of existing detached garage and erection of two-storey side and rear extensions, shallow front extensions and a single-storey side extension to provide gym accommodation; alterations to the roof to form a mansard roof with dormer windows and habitable accommodation, formation of a 4 m deep rear patio; and associated external alterations.Received 4 Nov 2026120246/HHA/26
- Dunham Oaks Dunham Road Altrincham WA14 4QDAwaiting decisionWorks to trees within Tree Preservation Order No. 067 specifically for felling of No. 1 Oak tree.Received 2 Nov 2026120354/TPO/26
- Belmont 5 Park Road Bowdon Altrincham WA14 3JGAwaiting decisionApplication for Certificate of Proposed Lawful Development for the replacement of windows, doors and the garage roof.Received 2 Nov 2026120266/CPL/26
- Altrincham Grammar School For Girls Cavendish Road Altrincham WA14 2NLAwaiting decisionReplacement of existing windowsReceived 28 Oct 2026120331/FUL/26
- Edgemoor BowdonAwaiting decisionWorks to trees within The Devisdale conservation area, specifically T1 Goat Willow - Crown reduce by 4m and remove any limbs/branches which are currently resting on the garage roofReceived 27 Oct 2026120241/S211/26
Planning in Bowdon
- Approved
- 94%
- 51 of 54 decided
- Decision time
- about 6 weeks
- on average
Applications within 1 km of the centre of Bowdon in the last 24 months, from Trafford Metropolitan Borough Council's planning register.
Decided by Trafford Metropolitan Borough CouncilCouncil page
Around Bowdon
Postcode districts
WA14 469 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Trafford Metropolitan Borough Council
For home projects and trades
- Architects in BowdonFor planning applications, extensions and new builds.
- Building contractors in BowdonLocal builders for approved plans and permitted development.
Builders and trades: get new Bowdon jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Bowdon
Bowdon is a picturesque village and electoral ward situated within the Metropolitan Borough of Trafford, Greater Manchester. As a suburb of Altrincham, it retains its historic roots in Cheshire, having joined Greater Manchester in 1974. This charming area may be of interest for planning applications due to its blend of suburban character and historical significance. The settlement has a population of approximately 9,228. It sits within the Trafford district.
There are currently no active flood warnings for the Bowdon area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Bowdon a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Bowdon has 4 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Bowdon planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Bowdon, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 169 planning applications were submitted near Bowdon. Of these, 94% were approved, with an average decision time of 45 days.
The most common types were tree works (58), full planning applications (24), discharge of conditions (11).
1 planning appeal was lodged, of which 1 was allowed and 0 were dismissed (100% success rate).