Search Bossiney planning applications
22 applications received or decided in the last 12 months · within 1 km of the centre of Bossiney · updated daily · Cornwall Council
Only 5 applications in the last 90 days, so this shows the last 12 months.
- Bossiney Lodge Bossiney Road Tintagel Cornwall PL34 0AYAwaiting decisionNon material amendment in relation to decision notice PA25/09343 dated 10/03/2026 to predominantly reduce the stone facing external wall material to the less publicly viewable elements of the elevations (to the south, east and west), and increasing the stone facing external material to the north elevationReceived 30 Oct 2026PA26/07584
- Land North Of Halgabron House Halgabron Tintagel Cornwall PL34 0BDAwaiting decisionApplication for Permission in Principle for the construction of up to 1 dwelling (minimum of 1, maximum of 1)Received 26 Oct 2026PA26/07453
- Land South West Of Merlins Way Merlins Way Tintagel Cornwall PL34 0BPAwaiting decisionErection of an agricultural shed, together with associated worksReceived 28 Sep 2026PA26/06707
- Sallows Bossiney Tintagel Cornwall PL34 0ALAwaiting decisionDemolition of existing kitchen, pantry and proposed single story replacement single storey dining room extension and conservatory to the rear. New first floor extension over existing annex.Received 3 Sep 2026PA26/05866
- Sunnybrae Molesworth Street Tintagel Cornwall PL34 0BZAwaiting decisionPre application advice to retain, extend and convert existing garage to a dwelling, add roof-mounted photovoltaic panels to the south roof slope and one roof light over the living area on the north roof slope.Received 18 Aug 2026PA26/00953/PREAPP
Planning in Bossiney
- Approved
- 70%
- 16 of 17 decided
- Decision time
- about 9 weeks
- on average
Applications within 1 km of the centre of Bossiney in the last 24 months, from Cornwall Council's planning register.
Decided by Cornwall CouncilCouncil page
Around Bossiney
Postcode districts
PL34 44 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Cornwall Council
For home projects and trades
- Architects in BossineyFor planning applications, extensions and new builds.
- Building contractors in BossineyLocal builders for approved plans and permitted development.
Builders and trades: get new Bossiney jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Bossiney
Bossiney is a charming village located in north Cornwall, England, and is part of the civil parish of Tintagel. Situated to the north-east of Tintagel village, it is in proximity to the scenic Rocky Valley and Trethevy. Historically, Bossiney was linked to Tintagel as a Rotten Borough until 1832, and the nearby Bossiney Haven beach adds to the area's appeal for potential development and planning applications. It sits within the Tintagel district.
There are currently no active flood warnings for the Bossiney area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Bossiney a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Bossiney has 5 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Bossiney planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Bossiney, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 37 planning applications were submitted near Bossiney. Of these, 70% were approved, with an average decision time of 62 days.
The most common types were full planning applications (14), outline applications (6), listed building and heritage (4).