Skip to content

Planning in Booth Bridge

Approved
94%
50 of 52 decided
Decision time
about 5 weeks
on average

Applications within 1 km of the centre of Booth Bridge in the last 24 months, from Pendle Borough Council's planning register.

Decided by Pendle Borough CouncilCouncil page

Around Booth Bridge

Postcode districts

BB18 73 applications in the last 12 monthsBD23 403 applications in the last 12 months

Applications in each district in the last 12 months.

Planning authority: Pendle Borough Council

For home projects and trades

About Booth Bridge

Booth Bridge is a settlement located in North Yorkshire, England.

There are currently no active flood warnings for the Booth Bridge area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.

In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Booth Bridge a particularly low-crime area, which is often reflected in its desirability and property values.

For anyone interested in property development or monitoring local planning decisions, Booth Bridge planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

To comment on or object to a planning application near Booth Bridge, open it in the list above: each one links to the council's own page for it and shows any comment deadline.

In the last 24 months, 64 planning applications were submitted near Booth Bridge. Of these, 94% were approved, with an average decision time of 37 days.

The most common types were tree works (20), full planning applications (17), outline applications (9).

1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).

Common questions

How many planning applications have been submitted near Booth Bridge?
In the last 24 months, 64 planning applications were submitted near Booth Bridge. The approval rate is 94%.
How long do planning decisions take near Booth Bridge?
The average planning decision time near Booth Bridge is 37 days. The statutory target is 8 weeks (56 days) for minor applications and 13 weeks for major applications.
What is the planning approval rate near Booth Bridge?
The planning approval rate near Booth Bridge is 94%. The national average across England and Wales is 87%.
What types of planning applications are most common near Booth Bridge?
The most common type of planning application near Booth Bridge is tree works applications, with 20 submissions in the last 24 months.
How can I track planning applications near Booth Bridge?
You can search and track planning applications near Booth Bridge on Planning Signal. Create a free account to save searches, watch specific applications, and receive email alerts when new plans are submitted nearby.