Search Binfield planning applications
23 applications received or decided in the last 12 months · within 1 km of the centre of Binfield · updated daily · Bracknell Forest Council
Only 8 applications in the last 90 days, so this shows the last 12 months.
- Jack O'newbury, Terrace Road North, Binfield, Bracknell, RG42 5PHAwaiting decisionRetention of air conditioning and air source heat pump units and EV charging pointsFull planning permissionReceived 23 Oct 2026PA/2026/0742
- 9 Brooke Place, Binfield, Bracknell, RG42 5JUAwaiting decisionT2 - 1 x Weeping Willow from Adjacent Property (Devonia) - Cut back to give 3m clearance to bungalowConsent under Tree Preservation OrdersReceived 23 Oct 2026PA/2026/0991
- 8 Swedish Houses, Tilehurst Lane, Binfield, Bracknell, RG42 5JPAwaiting decisionProposed Single Storey Rear and Side Extension to the Main Dwelling and a Detached Garage and Annex Structure Positioned in the Front of the SiteHouseholder planning permissionReceived 20 Oct 2026PA/2026/0928
- Mulberry House, Tilehurst Lane, Binfield, Bracknell, RG42 5JSAwaiting decisionTPO 1308 – G T1 - 1 x Dead Yew Tree at front - Reduce to ground level TPO 1308 – A1 T2 - 1 x Dead Sycamore at rear - Reduce to ground levelTree 5 Day Notification (TR5 Application)Received 16 Oct 2026PA/2026/0968
- 60, Silver Jubilee Field, Off Stevenson Drive, Bracknell, RG42 5TDAwaiting decisionA Purple Leaf Plum tree which is showing evidence of a Ganoderma bracket base. It is recommended to fell this tree as it will become unstable.Consent under Tree Preservation OrdersReceived 25 Sep 2026PA/2026/0909
Planning in Binfield
- Approved
- 94%
- 17 of 18 decided
- Decision time
- about 9 weeks
- on average
Applications within 1 km of the centre of Binfield in the last 24 months, from Bracknell Forest Council's planning register.
Decided by Bracknell Forest CouncilCouncil page
Around Binfield
Postcode districts
RG42 162 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Bracknell Forest Council
For home projects and trades
- Architects in BinfieldFor planning applications, extensions and new builds.
- Building contractors in BinfieldLocal builders for approved plans and permitted development.
Builders and trades: get new Binfield jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Binfield
Binfield is a civil parish and village located in Berkshire, England, with a population of 9,943 as of the 2021 census. Situated 2 miles north-west of Bracknell, 3 miles north-east of Wokingham, and 8 miles south-east of Reading, it marks the westernmost point of the Greater London Urban Area, making it a relevant area for planning applications due to its proximity to key towns and transport links. The settlement has a population of approximately 9,938 (2021 estimate). It sits within the Bracknell Forest district.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Binfield a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Binfield has 18 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Binfield planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Binfield, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 31 planning applications were submitted near Binfield. Of these, 94% were approved, with an average decision time of 66 days.
The most common types were tree works (14), discharge of conditions (3), full planning applications (2).