Search Berrysbridge planning applications
19 applications received or decided in the last 12 months · within 1 km of the centre of Berrysbridge · updated daily · Mid Devon District Council
Only 8 applications in the last 90 days, so this shows the last 12 months.
- Thornleigh Cottage Thorverton Exeter EX5 5LXAwaiting decisionErection of two-storey and single-storey extensions; and formation of vehicular access and parking area to the front elevationReceived 5 Nov 202626/01440/HOUSE
- 13 Silver Street Thorverton Exeter EX5 5LTAwaiting decisionNotification of intention to crown lift one Plum tree and one Acer tree by no more than 2-3m, including the removal of branches no greater than 50mm in diameter and to reduce the overall crown of one Mulberry tree by 2-3m within the Conservation AreaReceived 26 Oct 202626/01328/CAT
- Ridgemans Jericho Street Thorverton Exeter EX5 5PAAwaiting decisionErection of single-storey extensionHouseholder ApplicationReceived 19 Oct 202626/01360/HOUSE
- Thorverton Church of England Primary School School Lane Thorverton Exeter EX5 5NRAwaiting decisionApplication to sectional fell 1 Pine tree to ground level protected by Tree Preservation Order 70/00010/TPOReceived 28 Sep 202626/01287/TPO
- The Briars Jericho Street Thorverton Exeter EX5 5PAAwaiting decisionNotification of intention to fell 1 Cherry tree (T1), 1 Willow tree (T2) and 1 Crab Apple tree (T4); remove lower and low-hanging branches from 1 Birch tree (T3), fell four Damson stems (T5) and prune of two trees (G1) within the Conservation AreaReceived 22 Sep 202626/01261/CAT
Planning in Berrysbridge
- Approved
- 86%
- 12 of 13 decided
- Decision time
- about 6 weeks
- on average
Applications within 1 km of the centre of Berrysbridge in the last 24 months, from Mid Devon District Council's planning register.
Decided by Mid Devon District CouncilCouncil page
Around Berrysbridge
Postcode districts
EX5 321 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Mid Devon District Council
For home projects and trades
- Architects in BerrysbridgeFor planning applications, extensions and new builds.
- Building contractors in BerrysbridgeLocal builders for approved plans and permitted development.
Builders and trades: get new Berrysbridge jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Berrysbridge
Berrysbridge is a quaint village located in Devon, England, known for its rural charm and community atmosphere. As a part of the picturesque Devon landscape, it offers a unique setting for potential planning applications, attracting those interested in developing residential and community projects in a serene environment. It sits within the Thorverton district.
There are currently no active flood warnings for the Berrysbridge area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Berrysbridge a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Berrysbridge planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Berrysbridge, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 21 planning applications were submitted near Berrysbridge. Of these, 86% were approved, with an average decision time of 43 days.
The most common types were listed building and heritage (3), tree works (3), full planning applications (2).
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).