Beacon (EX14 4), Devon Planning Applications
Recent planning applications near Beacon (EX14 4), Devon.
Devon · England · settlement
About Beacon (EX14 4)
Beacon is a quaint hamlet located near Honiton in Devon, nestled at the foot of Hartridge Hill's southernmost point within the Luppitt parish. Its rural charm and picturesque surroundings make it a notable area for potential planning applications, contributing to the local community's development and character.
Enter a postcode to search for planning applications near Beacon (EX14 4).
Town Insights
Property Prices
Average property sale price: £270,964 (based on 50 recent transactions from HM Land Registry).
Area Information
- Admin district: East Devon
- Parliamentary constituency: Honiton and Sidmouth
- LSOA: East Devon 001C
Crime Statistics
1 crimes reported in 2026-03.
Crime Breakdown
- other-theft: 1
Flood Risk
No active flood warnings near Beacon (EX14 4).
Keyword Scorecard
Planning constraint analysis based on the last 24 months of applications near Beacon (EX14 4).
- Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
- Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
- Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
- Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
- Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
- Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
- Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
- Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)
Planning Activity Summary
Approval rates, average decision times, and application type distribution for Beacon (EX14 4) based on the last 24 months of planning data.
Nearby Applications
4 planning applications found near Beacon (EX14 4).
- - Barbers Farm Beacon Honiton EX14 4TX
Discharge of Condition for 24/1249/LBC: Condition 3 (Conservatory).
Status: Undecided | Type: Conditions | Council: East Devon | Date: 2026-02-27
View full details - - Pulmans Farm Beacon Honiton EX14 4TX
Proposed extension to the north-east elevation of the barn outbuilding to provide a toilet and shower room, and reinstatement of a section of boundary fencing along the western boundary of the site be
Status: Undecided | Type: Heritage | Council: East Devon | Date: 2025-12-03
View full details - - Barbers Farm Beacon Luppitt EX14 4TX
Replace existing conservatory with green oak framed structure on rear (south) elevation; remove window and wall in living room to create new opening between new conservatory and living room with the a
Status: Conditions | Type: Heritage | Council: East Devon | Date: 2024-07-11
View full details - - Land At Mill Rise Luppitt
General purpose agricultural building
Status: Conditions | Type: Full | Council: East Devon | Date: 2024-06-21
View full details
Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.
A brief summary of Beacon (EX14 4) in Devon
Beacon is a quaint hamlet located near Honiton in Devon, nestled at the foot of Hartridge Hill's southernmost point within the Luppitt parish. Its rural charm and picturesque surroundings make it a notable area for potential planning applications, contributing to the local community's development and character.
Property prices in Beacon (EX14 4) show an average sale price of £270,964, based on 50 recent transactions recorded by HM Land Registry.
Neighbourhood safety in Beacon (EX14 4) is generally good, with just 1 crimes reported in the most recent period.
Ecology & Nature Designations
The area around Beacon (EX14 4) includes 2 Sites of Special Scientific Interest (SSSI): Hense Moor SSSI, Hense Moor Meadows SSSI; 1 Areas of Outstanding Natural Beauty (AONB): Blackdown Hills. These designations may affect planning decisions, as proposals near protected sites require environmental impact assessment and may face additional restrictions.
For anyone interested in property development or monitoring local planning decisions, Beacon (EX14 4) planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
Planning Activity in Beacon (EX14 4)
In the last 24 months, 4 planning applications were submitted near Beacon (EX14 4). The average decision time was 73 days.
The average decision period of 73 days exceeds the 8-week target for minor applications but falls within the 13-week target for major schemes. Applicants should plan for approximately 11 weeks from submission to decision.
The most common application types near Beacon (EX14 4) were listed building and heritage (2), full planning applications (1), discharge of conditions (1). The high proportion of heritage applications reflects the historic character of the area and the presence of listed buildings or conservation areas nearby.
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate). This low success rate indicates that the council's refusal decisions are generally upheld by the Planning Inspectorate.
Nearby Towns
Explore planning applications in nearby areas:
- Hillside planning applications
- Shelvin planning applications
- Luppitt planning applications
- Wick planning applications
- Monkton planning applications
- Crook planning applications
- Northcote planning applications
- Combe Raleigh planning applications
Related Planning Guides
- What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
- What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
- How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.