Search Beacon planning applications
19 applications received or decided in the last 90 days · within 1 km of the centre of Beacon · updated daily · Cornwall Council
- 50 Condurrow Road Beacon Camborne Cornwall TR14 7SRAwaiting decisionSubmission of details to discharge conditions 2 (Cont land) 3 (Cont land 2) 6 (Instability) 7 (Drainage) 8 (Samples) 9 (Boundary treatments) and 10 (Bat boxes) in relation to Decision notice PA25/00920 dated 24.11.25ConditionsReceived 30 Oct 2026PA26/07328
- 26 Parc Bracket Street Camborne Cornwall TR14 8BNAwaiting decisionWorks to trees subject to a Tree Preservation Order T1, sycamore with merip removal of tree to ground level.Received 19 Oct 2026PA26/07261
- Beacon Cricket Club Tolcarne Road Beacon Camborne Cornwall TR14 9AAAwaiting decisionPermission for a new artificial cricket wicket at Beacon Cricket ClubReceived 16 Oct 2026PA26/07227
- 14 North Road Camborne Cornwall TR14 8ARAwaiting decisionSecond storey extension to provide disabled adaptationsReceived 15 Oct 2026PA26/06944
- Camborne Town Council Ground Floor Offices Basset Centre Basset Road Camborne Cornwall TR14 8SLAwaiting decisionListed Building Consent to incorporate the following amendments to previous approval PA24/07209: amendment to stair and lift core at rear of Basset to retain existing configuration; removal of Basset comms room failed timber floor and replacement with concrete; car park wall amendment to improve Puffing Devil access and minor landscape configuration updates; Puffing Devil pavilion and rooflights cladding; change in TECU specification from bronze to weathering steel; substation location and design updated; bin store roof updated; amendments to White House including stair window retained and raised; kitchen extract ducting reduced to one flue and concealed internally; cooling unit concealed to the back of first floor; CCTV antenna placed on north facade; rear roof structure remedial works; front render removal and lintel remediation; cement render removed and replaced with Cornish lime external insulating render to primary elevation and lime wash to other elevationsReceived 12 Oct 2026PA26/06917
Planning in Beacon
- Approved
- 73%
- 67 of 77 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Beacon in the last 24 months, from Cornwall Council's planning register.
Decided by Cornwall CouncilCouncil page
Around Beacon
Postcode districts
TR14 248 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Cornwall Council
For home projects and trades
- Architects in BeaconFor planning applications, extensions and new builds.
- Building contractors in BeaconLocal builders for approved plans and permitted development.
Builders and trades: get new Beacon jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Beacon
Beacon is a settlement located in Cornwall, England.
There are currently no active flood warnings for the Beacon area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Beacon a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Beacon has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Beacon planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Beacon, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 132 planning applications were submitted near Beacon. Of these, 73% were approved, with an average decision time of 55 days.
The most common types were full planning applications (39), tree works (15), discharge of conditions (13). 1 large-scale development was submitted during this period.
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).