Search Barrington planning applications
26 applications received or decided in the last 12 months · within 1 km of the centre of Barrington · updated daily · South Cambridgeshire District Council
Only 4 applications in the last 90 days, so this shows the last 12 months.
- Land Adjacent To 31 Shepreth Road Barrington Cambridgeshire CB22 7SBAwaiting decisionSubmission of details required by conditions 3 (Materials), 4 (Construction Traffic Management Plan), 5 (Tree Protection), 8 (Ecology Enhancement), 9 (Piling), 10 (Hard Landscaping), 11 (Soft Landscaping), 12 (Renewables), 14 (Pedestrian Visibility Splays), 15 (Driveway Drainage and Materials) and 19 (Self Build Occupancy) of planning permission 26/02427/S73Received 30 Oct 202626/02427/CONDA
- 25 West Green Barrington Cambridgeshire CB22 7RZAwaiting decisionT1 -Crab Apple - Reduce height and spread on all sides by 2m and shape T2 -Purple Plum - Reduce height by 2.5m, reduce spread on all sides by 2m and shape T3 -Hawthorn - Reduce height and spread on all sides by up to 1m and shape T4 - Dying Pear - Fell T5 - Hawthorn - Reduce height and spread on all sides by 1 -1.5m and shape T6 -Hazel group - Reduce height only by 1.5 -2mReceived 20 Oct 202626/1215/TTCA
- The Old Pool House 28 West Green Barrington Cambridgeshire CB22 7SAAwaiting decisionT1 - Hornbeam(carpinus betulus) - Fell.Received 9 Oct 202626/1166/TTCA
- Former Barrington Cement Works Haslingfield Road Barrington Cambridgeshire CB22 7RQAwaiting decisionSubmission of details required by conditon 18 (verification report) of planning permission 21/04087/FUL.Received 8 Oct 202621/04087/CONDT
- Land South Of Archer Bridge Shepreth Road Barrington CambridgeshireAwaiting decisionErection of footbridge and the retrospective installation of footings.Full ApplicationReceived 7 Aug 202626/02992/FUL
Planning in Barrington
- Approved
- 100%
- 16 of 16 decided
- Decision time
- about 7 weeks
- on average
Applications within 1 km of the centre of Barrington in the last 24 months, from South Cambridgeshire District Council's planning register.
Decided by South Cambridgeshire District CouncilCouncil page
Around Barrington
Postcode districts
CB22 472 applications in the last 12 monthsCB2 418 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: South Cambridgeshire District Council
For home projects and trades
- Architects in BarringtonFor planning applications, extensions and new builds.
- Building contractors in BarringtonLocal builders for approved plans and permitted development.
Builders and trades: get new Barrington jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Barrington
Barrington is a charming village and civil parish located in the South Cambridgeshire district, approximately 7 miles (11 km) southwest of Cambridge. Nestled between the villages of Haslingfield and Shepreth, it offers a tranquil setting that may be of interest for those exploring planning applications in the area. The settlement has a population of approximately 1,185 (2021 estimate). It sits within the South Cambridgeshire district.
The area around Barrington has 2 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Barrington planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications. Further local information can be found on the community website at http://www.barringtoncambs.com/.
To comment on or object to a planning application near Barrington, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 40 planning applications were submitted near Barrington. Of these, 100% were approved, with an average decision time of 50 days.
The most common types were tree works (14), discharge of conditions (9), full planning applications (4).