Search Barkway planning applications
13 applications received or decided in the last 90 days · within 1 km of the centre of Barkway · updated daily · North Hertfordshire District Council
- Land To The West Of London Road Barkway Hertfordshire SG8 8EYAwaiting decisionErection of stables and menage and installation gravel drive and replace existing access gates.Received 26 Oct 202626/02527/FP
- 9 High Street Barkway Royston Hertfordshire SG8 8EAAwaiting decisionDetails reserved by condition 5 (Weatherboarding) of planning permission reference no 25/00454/FP granted 10.07.2025Received 19 Oct 202626/02831/DOC
- 9 High Street Barkway Royston Hertfordshire SG8 8EAAwaiting decisionDetails reserved by condition 4 (Roof Materials) of planning permission reference no 25/00454/FP granted 10.07.2025Received 19 Oct 202626/02830/DOC
- 9 High Street Barkway Royston Hertfordshire SG8 8EAAwaiting decisionDetails reserved by condition 3 (Ecological Enhancement Plan) of planning permission reference no 25/00454/FP granted 10.07.2025Received 19 Oct 202626/02667/DOC
- 9 High Street Barkway Royston Hertfordshire SG8 8EAAwaiting decisionDetails reserved by condition 9 (Hard surfacing) of planning permission reference no 25/00454/FP granted 10.07.2025Received 19 Oct 202626/02832/DOC
Planning in Barkway
- Approved
- 94%
- 29 of 29 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Barkway in the last 24 months, from North Hertfordshire District Council's planning register.
Decided by North Hertfordshire District CouncilCouncil page
Around Barkway
Postcode districts
SG8 601 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: North Hertfordshire District Council
For home projects and trades
- Architects in BarkwayFor planning applications, extensions and new builds.
- Building contractors in BarkwayLocal builders for approved plans and permitted development.
Builders and trades: get new Barkway jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Barkway
Barkway is a charming village and civil parish located in the North Hertfordshire district, approximately five miles southeast of Royston and 35 miles from London. Situated 15 miles from the centre of Cambridge, it offers a unique blend of rural character and accessibility, with the Greenwich Prime Meridian running just a mile to the west. This location may be of interest for planning applications, given its proximity to key urban centres and transport links. The settlement has a population of approximately 849 (2021 estimate). It sits within the North Hertfordshire district.
There are currently no active flood warnings for the Barkway area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Barkway a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Barkway has 2 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Barkway planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications. Further local information can be found on the community website at http://www.barkway-village.org.uk/.
To comment on or object to a planning application near Barkway, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 46 planning applications were submitted near Barkway. Of these, 94% were approved, with an average decision time of 56 days.
The most common types were discharge of conditions (10), full planning applications (8), tree works (3). 1 large-scale development was submitted during this period.
1 planning appeal was lodged, of which 0 were allowed and 0 were dismissed.