Search Barepot planning applications
19 applications received or decided in the last 12 months · within 1 km of the centre of Barepot · updated daily · Cumberland Council
Only 2 applications in the last 90 days, so this shows the last 12 months.
- 22 Moor Road, Stainburn, Workington CA14 1XLAwaiting decisionNon material amendment application for a minor reduction in size to application HOU/2026/0076 for proposed single storey side extension and internal alterationsNon-Material AmendmentReceived 27 Oct 2026NMA/2026/0010
- Yearl Weir, situated on the River Derwent, Workington, CA14 1SN (nearest postcode), NY 01603 29157 (approximate National Grid reference for centre of Site)Awaiting decisionScreening opinion for the construction of two fish passes and ancillary works to allow fish and sediment across Yearl WeirScreening OpinionReceived 20 Oct 2026SCR/2026/0003
- 8 Calva Brow, Workington CA14 1DDAwaiting decisionOvergrown sycamore trees overhanging - Cut back and clear overhanging branches from the cottageConsent under Tree Preservation OrderReceived 3 Aug 2026WTPO/2026/0018
- The Orchard, Barepot, Workington, CA14 1JNApprovedNew garageHouseholder planning permissionReceived 23 Jun 2026Decided 4 Aug 2026HOU/2026/0088
- 30 Seaton Park, Seaton, Workington CA14 1EUApprovedProposed additional living accommodationHouseholder planning permissionReceived 8 Jun 2026Decided 17 Jul 2026HOU/2026/0091
Planning in Barepot
- Approved
- 94%
- 34 of 34 decided
- Decision time
- about 11 weeks
- on average
Applications within 1 km of the centre of Barepot in the last 24 months, from Cumberland Council's planning register.
Decided by Cumberland CouncilCouncil page
Around Barepot
Postcode districts
CA14 122 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Cumberland Council
For home projects and trades
- Architects in BarepotFor planning applications, extensions and new builds.
- Building contractors in BarepotLocal builders for approved plans and permitted development.
Builders and trades: get new Barepot jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Barepot
Barepot is a small village located in Cumbria, England, and is part of the expanding Workington area along with Seaton. With approximately 70 houses, Barepot sits on the banks of the River Derwent, offering a quaint residential atmosphere. While it lacks direct transport links, residents enjoy convenient access to the centre of Workington, just a short 5- to 10-minute walk away, making it an appealing option for those considering planning applications in the vicinity. It sits within the Workington district.
There are currently no active flood warnings for the Barepot area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Barepot a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Barepot has 10 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Barepot planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Barepot, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 45 planning applications were submitted near Barepot. Of these, 94% were approved, with an average decision time of 77 days.
The most common types were full planning applications (21), tree works (8), discharge of conditions (7). 1 large-scale development was submitted during this period.