Search Bannister Green planning applications
15 applications received or decided in the last 90 days · within 1 km of the centre of Bannister Green · updated daily · Uttlesford District Council
- Watchouse Green, Oak House Braintree Road Felsted Essex CM6 3JXAwaiting decisionApplication to discharge of condition 3 (Biodiversity Enhancement Plan), condition 5 (Landscaping Plan), condition 10 (Lighting Design), and condition 13 (Lighting Design) of UTT/26/0884/FUL.Received 28 Oct 2026UTT/26/2734/DOC
- Watchouse Green, Oak House Braintree Road Felsted Essex CM6 3JXAwaiting decisionApplication to discharge condition 24 (Trees) of UTT/26/0197/FUL.Received 28 Oct 2026UTT/26/2735/DOC
- Three Horse Shoes Bannister Green Felsted Essex CM6 3NDAwaiting decisionReplacement windows and entrance door and installation of double glazing within the existing side entrance door.Received 27 Oct 2026UTT/26/2723/LB
- Land East And North Of Clifford Smith Drive Watch House Green FelstedAwaiting decisionNon Material Amendment to UTT/22/3178/DFO - change to play area equipmentNon Material AmendmentReceived 22 Oct 2026UTT/26/2694/NMA
- Watch House Cottage Bannister Green Felsted Essex CM6 3NQApprovedProposed repair of water-damaged external wall involving removal of cement render and replacement with a lime render specificationReceived 4 Sep 2026Decided 29 Oct 2026UTT/26/2296/LB
Planning in Bannister Green
- Approved
- 65%
- 17 of 26 decided
- Decision time
- about 9 weeks
- on average
Applications within 1 km of the centre of Bannister Green in the last 24 months, from Uttlesford District Council's planning register.
Decided by Uttlesford District CouncilCouncil page
Around Bannister Green
Postcode districts
CM6 558 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Uttlesford District Council
For home projects and trades
- Architects in Bannister GreenFor planning applications, extensions and new builds.
- Building contractors in Bannister GreenLocal builders for approved plans and permitted development.
Builders and trades: get new Bannister Green jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Bannister Green
Bannister Green is a quaint village located near Felsted in the Uttlesford district of Essex, England. Once served by the now-closed Bannister Green Halt railway station on the Bishop's Stortford-Braintree Branch Line, the village had an estimated population of 1,167 in 2018. While the traditional pub 'The Three Horseshoes' is no longer operational, the area retains its charm and may offer opportunities for planning applications related to residential or community developments. The settlement has a population of approximately 1,167. It sits within the Felsted district.
There are currently no active flood warnings for the Bannister Green area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Bannister Green a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Bannister Green planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Bannister Green, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 69 planning applications were submitted near Bannister Green. Of these, 65% were approved, with an average decision time of 65 days.
The most common types were full planning applications (17), discharge of conditions (14), listed building and heritage (4). 1 large-scale development was submitted during this period.
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).