Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

Bankfoot, Perth and Kinross Planning Applications

Recent planning applications near Bankfoot, Perth and Kinross.

Perth and Kinross · Scotland · settlement

View council

About Bankfoot

Bankfoot is a village located in Perth and Kinross, Scotland, situated roughly 8 miles north of Perth and 7 miles south of Dunkeld. Its proximity to the A9 trunk road enhances its appeal as a convenient commuting hub within the region, making it a pertinent area for those researching planning applications and developments in Perthshire.

Enter a postcode to search for planning applications near Bankfoot.

Town Insights

Property Prices

Area Information

  • Admin district: Perth and Kinross
  • Parliamentary constituency: Perth and Kinross-shire
  • LSOA: North Inch - 03

Crime Statistics

0 crimes reported in 2026-03.

Flood Risk

No active flood warnings near Bankfoot.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near Bankfoot.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for Bankfoot based on the last 24 months of planning data.

Nearby Applications

6 planning applications found near Bankfoot.

  1. - Land 30 Metres North Of Auchtergaven And Moneydie Church Cairneyhill Road Bankfoot
    Erection of dwellinghouse and associated works
    Status: Permitted | Type: Full | Council: Perth | Date: 2026-02-05
    View full details
  2. - Land 180 Metres East Of Tigh Na Gleann Cairneyhill Road Bankfoot Perth PH1 4AG
    Erection of an agricultural building and formation of a track
    Status: Permitted | Type: Outline | Council: Perth | Date: 2026-01-08
    View full details
  3. 26/00018/PAA - Land 180 Metres East Of Tigh Na Gleann Cairneyhill Road Bankfoot Perth PH1 4AG
    Erection of an agricultural building and formation of a track
    Status: Permitted | Type: Outline | Council: Perth | Date: 2026-01-08
    View full details
  4. - Ard Callaid Cairneyhill Road Bankfoot Perth PH1 4AG
    Extension to dwellinghouse
    Status: Permitted | Type: Full | Council: Perth | Date: 2025-03-26
    View full details
  5. - 17 Tulliebelton Road Bankfoot Perth PH1 4BS
    Alterations to dwellinghouse
    Status: Permitted | Type: Full | Council: Perth | Date: 2024-01-05
    View full details
  6. - Clifton Main Street Bankfoot Perth PH1 4AA
    Alterations and replacement extension to dwellinghouse
    Status: Permitted | Type: Full | Council: Perth | Date: 2023-06-21
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of Bankfoot in Perth and Kinross

Bankfoot is a village located in Perth and Kinross, Scotland, situated roughly 8 miles north of Perth and 7 miles south of Dunkeld. Its proximity to the A9 trunk road enhances its appeal as a convenient commuting hub within the region, making it a pertinent area for those researching planning applications and developments in Perthshire.

There were no crimes reported in the immediate area during the most recent reporting period. This makes Bankfoot a particularly low-crime area.

For anyone interested in property development or monitoring local planning decisions, Bankfoot planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in Bankfoot

In the last 24 months, 4 planning applications were submitted near Bankfoot. Of these, 100% were approved, with an average decision time of 53 days.

This is notably above the national average of approximately 87%, suggesting a relatively permissive planning environment. Applicants near Bankfoot may find that well-prepared applications have a strong chance of success.

The average decision time of 53 days is within the government's 8-week statutory target for minor applications, indicating an efficient planning department.

The most common application types near Bankfoot were full planning applications (2), outline applications (2). Full planning applications account for 50% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.

Nearby Towns

Explore planning applications in nearby areas:

  • Waterloo planning applications
  • Airntully planning applications
  • Moneydie planning applications
  • Caputh planning applications
  • Murthly planning applications
  • Stanley planning applications
  • Redgorton planning applications
  • Pitcairngreen planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account